Laserfiche WebLink
Management of Change <br />ID Plant / Location Status <br />MC-16749 Leprino Foods - Tracy Completed (Closed) <br />Change Request <br />Orignator Date Of Request <br />Ben Schlegelmilch 1/4/2019 <br />Title <br />Hot Gas Tie-in for HCR Freezer Door <br />Description of Proposed Change <br />We are installing air curtain HCR doors into our storage freezer. They will have a heating coil that hot gas will go through. We will tie-in to <br />the hot gas line for our truck and rail vest for these doors. <br />Unit / Area Process <br />Main Hot Gas Line HCR Freezer Doors <br />Change Duration Priority <br />Permanent Temporary Urgent (Authorize ASAP)Routine <br />Project Start Date Projected Completion Date Actual Completion Date <br />1/22/2019 1/31/2019 2/19/2020 <br />Change Will Be <br />Replacement in kind May be approved immediately without further approval <br />Minor Impact on health and safety must be evaluated using Process Safety Questionnaire For Minor Changes <br />Major Process Hazard Analysis required to evaluate impact on health & safety <br />Reason For Change Request <br />Incident Investigation Attach incident investigation: <br />MI Audit Recommendation Which MI Audit (year) and recommendation no.? <br />PSSR Recommendation Attach PSSR Form: <br />PHA Recommendation Which PHA (year) and item number? <br />Change in refrigeration requirements (code change)Explain: <br />Expansion or renovation of facility Explain: Adding new doors to the storage freezer. To save on power long term, we are installing hot gas <br />coils on them. <br />Other Explain: <br />None <br />Technical Basis For Change (select all that apply) Explanation <br />Improve system performance <br />Increase system capacity <br />Update system parts Install new air curtain doors to prevent ice creation in our storage freezer. <br />Health and Safety Recommendation <br />Other <br />Reference Documents (sketches, blueprints, audit forms, etc.) <br />Type Title Included <br />File AFE for hot gas line project <br />File Stellar Proposal for work <br />P&ID Library [MAIN ENGINE ROOM EVAPORATORS UC-405 (EV-5), UC-406 (EV-8), UC-407 (EV-7) <br />and UC-408 (EV-6). (OLD STORAGE FREEZER)] LT-A-P-0524 <br />P&ID Library [MAIN ENGINE ROOM EVAPORATORS UC-401 (EV-1), UC-402 (EV-2), UC-403 (EV-3), <br />and UC-404 (EV-4). (PENTHOUSE STORAGE FREEZER)] LT-A-P-0525 <br />File Stellar Pipe and Valve Diagram <br />File Paker Vavles for Project <br />File Liquid Strainer <br />Needs Review <br />The Engineering MOC Checklist will be completed by whomever installs the change <br />To be installed by Engineering Checklist To Be Completed By <br />Company Outside Contractor <br />Changes Will Be Required To The Following Resources <br />Item Assigned To Due Date Completed By Date Comp. Attached File <br />Emergency Action Plan <br />Hazard Assessment Schlegelmilch, Ben 1/31/2019 Schlegelmilch Ben 5/22/2019 <br />Comments <br />File in APSM <br />Mechanical Integrity (PM Program)Schlegelmilch, Ben 1/31/2019 Schlegelmilch Ben 5/23/2019 -