Laserfiche WebLink
Engineering Checklist <br />MOC ID Plant / Location Title <br />MC-16749 Leprino Foods - Tracy Hot Gas Tie-in for HCR Freezer Door <br />Description of Proposed Change <br />We are installing air curtain HCR doors into our storage freezer. They will have a heating coil that hot gas will go through. We will tie-in to <br />the hot gas line for our truck and rail vest for these doors. <br />The Engineering MOC Checklist will be completed by whomever installs the change <br />To be installed by Engineering Checklist To Be Completed By <br />Company Outside Contractor <br />The following design requirements have been met:Verified By <br />(initials) <br />Date Verified <br />Yes No N/A Proposed change complies with the current ANSI/ASHRAE Standard Safety Code <br />for Mechanical Refrigeration <br />1/4/2019 <br />Yes No N/A Proposed change complies with ANSI/ASME Boiler and Pressure Vessel Code 1/4/2019 <br />Yes No N/A Proposed change complies with ANSI/ASME B31.5 Refrigeration Piping Code 1/4/2019 <br />Yes No N/A Proposed change complies with ANSI/IIAR-2; Equipment Design & Installation of <br />Mechanical Refrigeration Systems <br />1/4/2019 <br />Yes No N/A Proposed change complies with the current Uniform Mechanical Code 1/4/2019 <br />Yes No N/A Proposed change complies with the current Uniform Building Code (including local <br />practices) <br />1/4/2019 <br />Yes No N/A The proposed change is consistent with applicable IIAR guidelines for good practice 1/4/2019 <br />Yes No N/A Adequate safeties (e.g. float switches, temperature cutouts) have been included in <br />the proposed design? <br />1/4/2019 <br />Yes No N/A Adequate readouts and indicators (e.g. low temperature alarm) have been included <br />in the proposed design? <br />1/4/2019 <br />Yes No N/A Services (e.g. electrical power or cooling water) are adequate to meet needs of <br />proposed change? <br />1/4/2019 <br />Yes No N/A Chemical detectors/sensors have been added or moved as needed?1/4/2019 <br />The following safety information has been supplied:Verified By <br />(initials) <br />Date Verified <br />Yes No N/A The facility has been provided with revised P&ID’s showing the change 1/4/2019 <br />Yes No N/A The facility has been told about Preventative Maintenance requirements for the <br />change <br />1/4/2019 <br />Explain the PM changes and the discussion (as well as attendees): <br /> <br /> <br /> <br /> <br /> <br />Yes No N/A The facility has been given information to prepare SOPs to operate the change 1/4/2019 <br />Yes No N/A Facility operating personnel have been trained in how to use the change 1/4/2019 <br />Explain the training activity that took place as well as attendees: <br /> <br /> <br /> <br /> <br /> <br />Reviewed / Approved By <br />Printed Name Signature <br />Ben Schlegelmilch <br />Date <br />1/4/2019