My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CO0053618
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
2401
>
2500 – Emergency Response Program
>
CO0053618
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2023 1:53:04 PM
Creation date
7/11/2023 1:10:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2500 – Emergency Response Program
RECORD_ID
CO0053618
PE
2546
FACILITY_NAME
LEPRINO FOODS
STREET_NUMBER
2401
Direction
N
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21307050
ENTERED_DATE
3/31/2021 12:00:00 AM
SITE_LOCATION
2401 N MACARTHUR DR
RECEIVED_DATE
3/31/2021 12:00:00 AM
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\bmascaro
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pre-Startup Safety Review <br />Verification <br />LEPRINO FOODS - TRACY <br />Tracy, CA <br />Facility Information <br />Owner Inspection Leader <br />Facility Type Location <br />❑ ■New Modified Leprino Foods - Tracy (Tracy CA) <br />Meeting Attendees <br />Scope of Work <br />Verifcation Sign-Off <br />Requirement Reference Documents <br />■Yes ❑N/A <br />All process safety information is complete, current, accurate <br />and accessible to all 'included' employees <br />■Yes ❑N/A <br />The process hazard analysis is complete for all new facilities, <br />and the management of change has been completed for all <br />modified facilities <br />■Yes ❑N/A <br />The specific requirements of these elements have been <br />completed satisfactorily <br />■Yes ❑N/A <br />All safety procedures have been developed, or modified, and <br />are implemented <br />■Yes ❑N/A <br />All operating procedures have been developed, or modified, <br />and are implemented <br />■Yes ❑N/A <br />All maintenance procedures have been developed, or <br />modified, and are implemented <br />■Yes ❑N/A <br />All emergency procedures have been developed, or modified, <br />and are implemented <br />■Yes ❑N/A <br />Construction of piping, instrumentation, and equipment is in <br />accordance with the P&IDs and other design specifications <br />■Yes ❑N/A <br />Training has been completed for all employees involved in <br />operating the process
The URL can be used to link to this page
Your browser does not support the video tag.