Laserfiche WebLink
Underground Storage Tank <br />Monitoring System Certification Form <br />18. IN -TANK GAUGING TESTING <br />IF Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if NO tank gauging equipment is installed. <br />Do not complete this section if either box is checked. <br />Yes <br />No <br />NA <br />All wiring has been: 1) visually inspected for kinks, breaks and proper entry and <br />termination; and 2 tested for ground faults? <br />0 <br />0 <br />0 <br />Were all in -tank gauging probes visually inspected for damage and residue buildup <br />to ensure that floats move freely, functionally tested, and confirmed operational? <br />❑ <br />❑ <br />Was accuracy of system's product level readings tested? <br />❑ <br />❑ <br />❑ <br />Was accuracy of system's water level readings tested? <br />❑ <br />❑ <br />❑ <br />Were all probes reinstalled properly? <br />❑ <br />❑ <br />❑ <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />❑ <br />❑ <br />❑ <br />Probe ID <br />Probe Model <br />Tanks Monitored <br />Pass <br />Fail <br />❑ <br />0 <br />0 <br />0 <br />❑ <br />0 <br />9. COMMENTS <br />Describe all answers marked "No" or "Fail" and proposed remedy. <br />List all monitoring equipment either replaced or repaired. <br />All UDC's are equipped with Bravo float and chain assemblies. All were tested passing results <br />were yielded for all. 2 Floats in UDC 1-2 and 1 float in UDC 3-4 required cleaning before <br />passing results were obeserved. <br />All Fill sumps have a large amount of rain water in them. We estimate 150-200 Gallons in total. <br />Page 5 of 6 <br />