Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 8. IN-TANK GAUGING TESTING <br /> 0 Check this box if tank gauging is used only for inventory control. <br /> 0 Check this box if NO tank gauging equipment is installed. Yes No NA <br /> Do not complete this section if either box is checked. <br /> All wiring has been: 1) visually inspected for kinks, breaks and proper entry and ❑ ❑ ❑ <br /> termination; and 2 tested for ground faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup <br /> to ensure that floats move freely, functionally tested, and confirmed operational? <br /> Was accuracy of system's product level readings tested? 0 0 <br /> Was accuracy of system's water level readings tested? ❑ <br /> Were all probes reinstalled properly? IF] 0 ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? © ❑ ❑ <br /> Probe ID Probe Model Tanks Monitored Pass Fail <br /> ❑ F <br /> © r� <br /> D <br /> D ❑ <br /> 9. COMMENTS <br /> Describe all answers marked "No"or "Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> 87 MLLD Inconclusive. The Veeder-Root Isotrol 1-8 Control Box is not functional, will not allow the STP Motor to <br /> shutdown when there is no Pump Signal. Would not allow for the 87 MLLD to be tested. <br /> Page 5of6 <br />