My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAROLYN WESTON
>
601
>
2300 - Underground Storage Tank Program
>
PR0546181
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 8:50:31 AM
Creation date
7/21/2023 9:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0546181
PE
2351
FACILITY_ID
FA0026131
FACILITY_NAME
7-ELEVEN INC. #38616
STREET_NUMBER
601
Direction
W
STREET_NAME
CAROLYN WESTON
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16422019
CURRENT_STATUS
01
SITE_LOCATION
601 W CAROLYN WESTON BLVD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 8. IN-TANK GAUGING TESTING <br /> 0 Check this box if tank gauging is used only for inventory control. <br /> LJ Check this box if No tank gauging equipment is installed. Yes No NA <br /> Do not complete this section if either box is checked. <br /> All wiring has been: 1) visually inspected for kinks, breaks and proper entry and ❑ ❑ ❑ <br /> termination; and 2 tested for ground faults? <br /> Were afl in-tank gauging probes visually inspected for damage and residue buildup ❑ ❑ ❑ <br /> to ensure that floats move free! . functional!y tested. and confirmed o erational? <br /> Was accuracy of system's product level readings tested? D ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? ❑ ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ ❑ <br /> Probe ID Probe Model Tanks Monitored Pass Fail <br /> Ll ❑ <br /> J Q <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> 19. COMMENTS <br /> Describe all answers marked "No"or ''Fail" and proposed remedy. <br /> List all monitoring equipment either replaced or repairers, <br /> WAS ONLY THERE TO TEST ALL UDC'S AND STPS,VENT BOX AND ALL LD'S <br /> ALSO ALL SMARTSENSORS TESTED AND PASSED. LIQUID SENSOR LISTED WERE TESTED ON 8/19/22. <br /> Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.