Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> UST Monitoring Site Plan <br /> Site Address: MANTECA GAS&FOOD 1229 E LOUISE AVE MANTECA,CA <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . cns . . . . "PIPING <br /> O R (ARROWS) <br /> Ov Drawing ofpiping <br /> ° ° exit of sump and <br /> R T S <br /> .0 X L UDC's.No <br /> FX <br /> O underground <br /> O drawing is <br /> accurate,we <br /> R R cannot speculate <br /> . . . . . . . . . . . . . . . . . . . . . . x v ° . . . . . . . blue prints. <br /> . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . 0 . . . . . . . . . e�� <br /> . . . . . . . . . . . . X L X X L X . . . . . . . <br /> . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> E-STOP. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . s .4. 7. R 8. . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . x . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . KEY <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A=ANNULAR Sensor <br /> . . . . . . . . . . . . . . . . . F=FILLS <br /> . . . . . . . . . . . 1. s .2. . . . . .5. R 6. . . . . . . V=VAPOR <br /> P=PROBE <br /> T . . . . . . . . . . . x . . . . . . . <br /> L L=Turbine/Leak Detector <br /> g . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . X=SUMP SENSOR <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B=Brine Sensor <br /> S=Smart Sensor <br /> 9jp'itan nnivgraratitfadm narrsibleialiecwl{,mglcclrerar area C=Floats&Chains <br /> s ass}aural c+ifsaaa; arxfara sda;:s,l6r irfnrnnmfn2prnpxa_Dharrng E=EStop <br /> mS to scala <br /> Date map was drawn: 8/12/21 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification.On your site plan, <br /> show the general layout of tanks and piping.Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br /> Page 6 of 6 <br />