My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2024 1:45:09 PM
Creation date
7/26/2023 4:29:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
GAVINKO PETROLEUM*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br /> ( Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br /> 1 . Site map enclosed ? YES [ ] NO [ ] <br /> 2 . Submit copies of ICC Service Technician and/or Installer' s certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced . Ensure a copy of the " Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements . If repairing a component , describe how this will be done . ( If <br /> adding piping , UDC ' s , or other UST equipment , or performing tank top upgrade , use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review) : <br /> Remove current dispensers . Install ( 3 ) Gilbarco 700 3 + 0 and ( 1 ) Gilbarco 700 3 + 1 dispensers . <br /> Install Bravo Converson frames and deflector kits . Upgrade Veeder Root software . <br /> Assist to Balance . New hanging hardware . Cold start . <br /> 4 . List of equipment to be used (Attach manufacturer' s specification sheets showing third -party approval) : <br /> Gilbarco 700 dispensers <br /> Bravo Conversion Frame and Deflector kit <br /> Balance hanging hardware <br /> Veeder Root software upgrade <br /> EH230038 (revised 12- 11 - 15) 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.