My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2070
>
2300 - Underground Storage Tank Program
>
PR0517407
>
REMOVAL_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2023 11:43:22 AM
Creation date
8/3/2023 11:40:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2023
RECORD_ID
PR0517407
PE
2381
FACILITY_ID
FA0013409
FACILITY_NAME
EL DORADO AUTO
STREET_NUMBER
2070
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
2070 S EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA N J O A Q U I N Environmental Health Department <br />--00UN i <br />SAMPLING PROTOCOL FOR ROUTINE TANK REMOVALS <br />The following represents minimum sampling criterion required for closure compliance. Soil samples collected shall be <br />representative of native soils beneath the tank's invert (tank's bottom) at a collection depth not to exceed 2 - 4 feet. If <br />contamination is documented during closure, an Unauthorized Release Notification must be completed and submitted within <br />five (5) working days pursuant to California Health & Safety Code, Section 25295. Samples cannot be combined into a <br />composite sample for analysis in the field or the lab. Each sample must have a set of corresponding analytical <br />results. <br />WATER NOT PRESENT IN THE TANK PIT <br />PIPING AND STOCKPILE <br />MINIMUM NUMBER of <br />LOCATION of SOIL <br />MINIMUM NUMBER of <br />TANK <br />#/ <br />TANK SIZE <br />(Gallons) <br />MINIMUM NUMBER <br />of SOIL SAMPLES <br />LOCATION OF SOIL SAMPLES <br />MINIMUM NUMBER <br />of SOIL SAMPLES <br />TANK & PIPING STOCKPILE SAMPLES <br />2 Samples every 50 cubic yards <br />1'� <br /><1,000 <br />2 perTank <br />% am eel C17 eOd of +4Lf7L <br />Single Tank <br />1,000 - 101000 <br />2 perTank <br />1 at each End of Tank <br />Center and Ends OR <br />> 101000 <br />3 or More <br />per Tank <br />Ends and Middle OR generally <br />spaced along the length of the Tank <br />5 <br />per Tank <br />4 from wall next to tank <br />Sides of Tank <br />PIPING AND STOCKPILE <br />TANK <br />WATER IS PRESENT IN TANK PIT <br />TANK SIZE <br />MINIMUM NUMBER of <br />LOCATION of SOIL <br />MINIMUM NUMBER of <br />r' <br />PIPING SOIL SAMPLES <br />1 Sample e ery 20 lineal feet <br />WATER SAMPLES <br />MINIMUM NUMBER <br />of SOIL SAMPLES <br />TANK & PIPING STOCKPILE SAMPLES <br />2 Samples every 50 cubic yards <br />< 101000 <br />2 from wall next to tank <br />TANK <br />WATER IS PRESENT IN TANK PIT <br />TANK SIZE <br />MINIMUM NUMBER of <br />LOCATION of SOIL <br />MINIMUM NUMBER of <br />(Gallons) <br />SOIL SAMPLES <br />SAMPLES <br />WATER SAMPLES <br />MINIMUM NUMBER <br />of SOIL SAMPLES <br />LOCATION of SOIL SAMPLES <br />< 101000 <br />2 from wall next to tank <br />Single Tank <br />3 <br />ends at soil/groundwater <br />1 <br />Center and Ends OR <br />Sides of Tank <br />interface & 1 below tank <br />1,000 - 101000 <br />5 <br />per Tank <br />4 from wall next to tank <br />Sides of Tank <br />> 101000 OR <br />> 101000 <br />ends at soil/groundwater <br />OR More per Tank <br />Tank Cluster <br />5 or more <br />interface & 1 below each <br />1 <br />tank <br />SLAB PRESENT IN THE TANK PIT <br />Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in <br />order to collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) <br />Tri -Regional Recommendations —Appendix A <br />6of10 <br />TANK <br /># <br />TANK SIZE <br />(Gallons) <br />MINIMUM NUMBER <br />of SOIL SAMPLES <br />LOCATION of SOIL SAMPLES <br />< 1,000 <br />3 <br />per Tank <br />Center and Ends OR <br />Sides of Tank <br />�( <br />J� <br />1,000 - 101000 <br />5 <br />per Tank <br />Center and Ends OR <br />Sides of Tank <br />> 101000 <br />5 <br />OR More per Tank <br />Ends and Middle and <br />along the length of the <br />generally spaced <br />Tank <br />Tri -Regional Recommendations —Appendix A <br />6of10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.