Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> PA-2300062 <br /> JERRY L. GERARDOT ET AL/VERTICAL BRIDGE <br /> Administrative Use Permit Application No. PA-2300062 was approved by the Community Development <br /> Department on October 11,2023.The effective date of approval is October 21,2023.This approval will <br /> expire on October 21, 2026, which is 36 months from the effective date of approval, unless (1) all <br /> Conditions of Approval have been complied with, (2)all necessary building permits have been issued <br /> and remain in force, and (3) all necessary permits from other agencies have been issued and remain <br /> in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to-this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Contact: [209] 468-3121) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainaae, driveway access details including gates, on-site <br /> parking; landscaping, signs, existing and proposed utility services, and grading (refer to Yrre "SITE <br /> PLAN CHECK LIST' for details). Foundation and soils investigation shall be conducted in <br /> conformance with Chapter 18 of the California Building Code at the time of permit application. A <br /> fee is required for the Site Plan review. (Development Title Section 9-802.110(a)(2)) <br /> b. APPROVED USE: This approval is for a 130-foot monopole telecommunications facility Site Plan <br /> dated June 13, 2023. The project also includes-the installation of ancillary equipment within a 2,500 <br /> square foot leased area. (Use Type- Communications Facility—Tower) <br /> c. CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital <br /> Facility Fee is applicable, the County shall collect the fees before the issuance-of any building <br /> permits. (Development Title Section 9-610.070) <br /> d. SETBACKS:The structure shall comply with the following setback requirements; <br /> 1. The freestanding tower, and associated antennas, shall be setback a minimum of 130 feet from <br /> property lines. (Development Title Section 9-411.050(c)(1)) <br /> e. CONCEALMENT: All facilities must be designed to visually blend into the surrounding area. <br /> (Development Title Section 9-411.050(a)(6)) <br /> f. LIGHTS: Unless otherwise required under FAA or FCC regulations, applicants may install only <br /> timed or motion-sensitive light controllers and fully-shielded lights such that the light source is not <br /> directly visible from any adjacent residential land uses. All aircraft warning lighting must use lighting <br /> enclosures that avoid illumination impacts on-residential land uses to the maximum extent feasible. <br /> (Development Title Section 9-411.050(a)(1)) <br /> g. FENCES, ENCLOSURES AND SECURITY:The facility must comply with the following standards. <br /> (Development Title Section 9-411.050(a)(6)) <br /> 1. No barbed wire, razor ribbon, electrified fences or any similar measures shall be allowed to <br /> secure a wireless facility, unless the applicant demonstrates to the satisfaction of the Approval <br /> Authority that the need for such measures significantly outweighs the potential danger to the <br /> PA-2300062—Conditions of Approval 1 <br />