My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:03:45 PM
Creation date
8/16/2023 2:19:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
474
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FORWARD LANDFILL WINTERIZATION PLAN <br /> 2023-2024 WET SEASON <br /> October 2023 <br /> 1. Recent History <br /> Forward constructed waste management unit(WMU) FU-19 in 2019 and filling began in this cell <br /> in late February 2020, after the cell construction was approved by the CVRWQCB. Forward has <br /> been disposing of Class II and Class III refuse in WMU FU-19 and in the completed cells to the <br /> north of WMU FU-19. In addition, Forward recently completed construction of WMU FU-23, <br /> which is located directly east of WMU FU-17. However, WMU FU-23 is not yet approved for <br /> disposal by the CVRWQCB. <br /> 2. Reseeding and Erosion Control <br /> An annual inspection of the vegetative cover has been completed. The areas that were found to <br /> have a lack of necessary cover will be seeded just prior to the next rain event to control erosion. <br /> Presently all erosion has been addressed and will be monitored throughout the wet season. Areas <br /> that are found to be eroded will be covered with dirt immediately upon suitable weather conditions. <br /> 3. Drainage <br /> Non-contact water will be directed to three locations: <br /> • The first location (compost stormwater pond) accumulates non-contact water from the <br /> current Forward Resource Recovery Facility (FRRF) and is located on the west corner of <br /> the FRRF, south of the South Fork of Little Johns Creek. In accordance with Waste <br /> Discharge Requirements Order No.R5-2014-0006,the compost stormwater pond is a lined <br /> impoundment to collect all runoff from the FRRF. <br /> • The second location(southwest pond)services the current southern portion of the Forward <br /> Landfill and is located at the southwest corner of this area,north of the South Fork of Little <br /> Johns Creek. <br /> • The third non-contact water pond (northwest pond) is located at the southwest corner of <br /> the northern portion of Forward Landfill, directly west of WMU FU-03. <br />
The URL can be used to link to this page
Your browser does not support the video tag.