Laserfiche WebLink
Q GENERAL NOTES: NOTES FOR BENTONITE PLUGS: ABBREVIATIONS: <br /> 1. NOTES AND DETAILS ON THE DRAWINGS SHALL TAKE PRECEDENCE OVER THESE GENERAL NOTES AND TYPICAL 1. MATERIALS REQURIRED: APPROX. APPROXIMATE <br /> DETAILS OR SPECIFICATIONS. ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS LLJ <br /> • 3/8" TO 3/4" WYOMING SODIUM BENTONITE CHIPS (PDS CO. PLUG OR BARIOD HOLE PLUG) <br /> CMP CORRUGATED METAL PIPE Q <br /> 2. CONTRACTOR IS ADVISED TO NOT SCALE DRAWINGS. IF DIMENSIONS OR DETAILS ARE NOT CLEAR OR IF <br /> ' • BENTONITE MESH (8-MESH PDS GRANULAR SEAL OR BARIOD BENSEAL) DEG,° DEGREE <br /> DISCREPANCIES EXIST ON THE DRAWINGS, CONTACT ENGINEER. ELEV., EL. ELEVATION <br /> 0 <br /> 3. WHERE REFERENCE IS MADE TO VARIOUS TEST STANDARDS FOR MATERIAL, SUCH STANDARDS SHALL BE THE • VISCOSIFIER/BOREHOLE STABILIZER POLYMER (PDS SUPER MUD OR HALLIBURTON QUICK MUD D-50) EXIST. EXISTING <br /> LATEST EDITION AND/OR ADDENDUM. 2. EACH "BATCH" TO BE PREPARED AS FOLLOWS. BATCHES TO BE PREPARED NOT TO EXCEED 6-IN LIFTS: FT., ' FOOT <br /> 4. THE CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED GAS COLLECTION AND CONTROL • STEP 1 - PLACE SEVERAL GALLONS OF WATER IN THE BUCKET. GAL. GALLON <br /> SYSTEM. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL GALV. GALVANIZED• STEP 2 - ADD PDS SUPER MUD OR HALLIBURTON QUICK MUD D-50 POLYMER PER MANUFACTURER HDPE HIGH DENSITY POLYETHYLENE o <br /> MEASURES NECESSARY TO PROTECT THE EXISTING ENVIRONMENTAL FEATURES DURING CONSTRUCTION AND INSTRUCTIONS. HP HIGH POINT <br /> AFTER CONSTRUCTION. w <br /> • STEP 3 - MIX THOROUGHLY USING A GROUT MIXER UNTIL UNIFORM IN COLOR. IN., " INCH Of <br /> 5. THE CONTRACTOR SHALL TAKE NO ADVANTAGE OF ANY ERROR OR OMISSION IN THE PLANS, ESTIMATED 1.E. INVERT ELEVATION <br /> QUANTITIES OR SPECIFICATIONS. THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND • STEP 4 - ADD BENTONITE CHIPS TO THE BUCKET MIXING WITH A GROUT MIXER UNTIL UNIFORM IN LF LINEAR FEET <br /> CONDITIONS ON THE JOB SITE PRIOR TO COMMENCING WITH THE WORK. SPECIAL CARE SHALL BE GIVEN TO SITE COLOR. LFG LANDFILL GAS <br /> AND EQUIPMENT LAYOUT THEREON. IN THE EVENT THE CONTRACTOR DISCOVERS AN ERROR, OMISSION, OR • STEP 5 - ADD BENTONITE MESH TO THE BUCKET MIXING WITH A GROUT MIXER UNTIL UNIFORM IN MAX. MAXIMUM <br /> POSSIBLE DISCREPANCY BETWEEN FIELD CONDITIONS AND THE DRAWINGS, THEY SHALL IMMEDIATELY NOTIFY COLOR AND THOROUGHLY BLENDED. MIN. MINIMUM <br /> THE ENGINEER PRIOR TO PROCEEDING WITH THE WORK. MSL MEAN SEA LEVEL <br /> • <br /> 6. THE DESIGN, ADEQUACY AND SAFETY OF ERECTION, BRACING, SHORING, TEMPORARY SUPPORTS, ETC. IS THE STEP 6 - PLACE THE MIXTURE AROUND THE FULL CIRCUMFERENCE OF THE WELL PIPE. NPT NATIONAL PIPE TAPERED THREADS <br /> SOLE RESPONSIBILITY OF THE CONTRACTOR. STEP 7 - REPEAT STEPS 1-6 IN 6 INCH LIFTS UNTIL A SEAL DEPTH SHOWN ON PLANS IS ACHIEVED. SEAL NTS NOT TO SCALE z aaaaaa <br /> °i DEPTH TO BE CONFIRMED BY MEASUREMENT. NO., # NUMBER <br /> 7. ALL DETAIL CALLOUTS AS SHOWN ON THE DRAWINGS, SECTIONS AND ELEVATIONS SHALL APPLY TO ALL SIMILAR PSI POUND PER SQUARE INCH <br /> D CONDITIONS WHETHER REFERENCED OR NOT. TYPICAL DETAILS AND NOTES SHALL APPLY UNLESS SHOWN • CONTRACTOR IS REQUIRED TO WAIT AT LEAST 20 MINUTES AFTER COMPLETION OF THE ENTIRE SEAL PRIOR TO PVC POLYVINYL CHLORIDE <br /> OTHERWISE IN DRAWINGS. PLACING THE SOIL BACKFILL. 0 <br /> m QED QED ENVIRONMENTAL SYSTEMS U) <br /> Q 8. THE CONTRACTOR SHALL LAY OUT PIPE TO CONFORM TO FIELD CONDITIONS. PROVIDE 48" MINIMUM COVER AND SCH. SCHEDULE z <br /> SDR STANDARD DIMENSION RATIO LD <br /> 5% MINIMUM SLOPE CROSSING BELOW PERIMETER AND MAIN HAUL ROADS. PROVIDE MINIMUM PIPE DRAINAGE U <br /> S.S. STAINLESS STEEL w Q <br /> SLOPE OF 3% WITHIN WASTE LIMIT AND 1% OUTSIDE WASTE LIMIT. CONTRACTOR RESPONSIBLE FOR CUT (12" o '>'<- z v <br /> MAX, UNLESS OTHERWISE NOTED PER PLAN) AND FILL BENEATH PIPE TO ENSURE PROPER DRAINAGE, AS TYP. TYPICAL J g 0 <br /> N APPROVED BY THE OWNER/ENGINEER. W/ WITH z Q < Q <br /> 0 DIAMETER <br /> IE N 9. HEADER AND LATERAL PIPING SHALL BE STAKED PRIOR TO COMMENCEMENT OF WORK AND APPROVED BY % PERCENT ' N o <br /> o CLIENT AND ENGINEER. HOWEVER, THIS DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO w Q <br /> MAINTAIN THE MINIMUM SLOPE AND SOIL COVER ON ALL INSTALLED PIPING. CONTRACTOR TO ADJUST FOR <br /> ACTUAL FIELD CONDITIONS. o <br /> 6 W <br /> 10. NO PIPE TRENCH SHALL BE LEFT OPEN OVERNIGHT. Of <br /> i <br /> 11. ALL PIPING TO BE INSTALLED TO PROVIDE POSITIVE CONDENSATE DRAINAGE TO PROPOSED LOW POINTS OR <br /> o CONDENSATE SUMPS. <br /> 12. ALL LFG HEADER AND LATERAL PIPING SHALL BE HDPE SDR 17 FOR ALL SIZES, AIR LINE SHALL BE HDPE SDR 9, <br /> Ln <br /> Q CONDENSATE LINE SHALL BE HDPE SDR 11. ALL ROAD CROSSINGS SHALL INCLUDE 16 GAUGE CORRUGATED 0 <br /> C)f METAL PIPE. <br /> Lu <br /> 13. ALL INSTALLED PIPE, WHETHER ABOVE OR BELOW GRADE, SHALL BE PRESSURE TESTED AFTER INSTALLATION. <br /> THE CONSTRUCTION QUALITY ASSURANCE CONSULTANT MUST BE PRESENT FOR ALL PNEUMATIC PRESSUREcc <br /> o <br /> TESTS. THE PRESSURE TEST WILL BE AS FOLLOWS: <br /> Q • LANDFILL GAS HEADER AND LATERAL PIPING SHALL BE PRESSURIZED WITH AIR TO 4 PSI AND HOLD THAT ct <br /> tv PA <br /> W PRESSURE FOR A PERIOD OF 1 HOUR; I; <br /> • AIR SUPPLY AND DEWATERING DISCHARGE LINE PIPING SHALL BE CONDUCTED AT 4 PSI FOR 30 MINUTES, w <br /> THEN THE PRESSURE SHALL BE INCREASED TO 100 PSI AND HELD FOR AN ADDITIONAL 30 MINUTES; <br /> N <br /> • CONTRACTOR SHALL PRESSURE TEST THE LINES WHILE THEY ARE IN THE TRENCH; cn <br /> • USE PRESSURE GAUGE THAT ALLOWS THE CQA CONSULTANT TO DETERMINE IF THE PRESSURE DROPS w <br /> MORE THAN 10% OF THE INITIAL PRESSURE WITHIN THE ONE-HOUR TEST PERIOD; <br /> • A DROP IN PRESSURE SHALL INDICATE A LEAK EXISTS AND SHALL BE REPAIRED AND RETESTED; wY }� <br /> coW <br /> °i • PIPE SHALL BE TESTED IN SEGMENTS NO LONGER THAN 2,000 FEET UNLESS APPROVED BY THE o <br /> z <br /> o ENGINEER. <br /> Q <br /> 15. CONTRACTOR IS RESPONSIBLE FOR HAULING EXCAVATED WASTE TO THE WORKING FACE THE SAME DAY. NO W J <br /> EXCAVATED WASTE SHALL BE LEFT OVERNIGHT. W U) o 0 <br /> LU <br /> 16. CONTRACTOR IS RESPONSIBLE FOR THE CONSTRUCTION AND REMOVAL OF DRILLING PADS, AND FOR 0 z <br /> co <br /> RESTORING GRADES TO THEIR ORIGINAL CONDITIONS FOR ALL AREAS DISTURBED DURING CONSTRUCTION. J 3 <br /> L <br /> in U <br /> 17. CONTRACTOR SHALL PROVIDE ACCESS FOR CONSTRUCTION QUALITY ASSURANCE CONSULTANT TO PERFORM Z Z o <br /> FIELD SURVEYS TO RECORD AS-BUILT CONDITIONS. PIPE RUNS SHALL BE RECORDED AT NATURAL GROUND AND co W w N L0 o 0 <br /> THE TOP OF PIPE EVERY 50 FEET ON INSTALLED PIPING, OR MORE FREQUENT FOR PIPE BENDS, FITTINGS, AND z � o 0 <br /> o VALVES. AS-BUILT SURVEY IS TO BE COMPLETED AND APPROVED BEFORE CONTRACTOR LEAVES SITE. U) O o - o N :E <br /> N = <br /> Qom <br /> N 18. ALL EXISTING PIPING THAT IS NOT IN USE, AS DIRECTED BY THE OWNER/ENGINEER, SHALL BE RELOCATED BY > Q � z <br /> M Q L, Z m <br /> THE CONTRACTOR TO THE ONSITE STORAGE FACILITY. � w °0- w <br /> I� a o <br /> U <br /> n o 19. CONTRACTOR TO USE FACTORY MOLDED/FABRICATED CONCENTRIC REDUCER FITTINGS AS NECESSARY. SATE: <br /> NJ Q) 09/05/2023 <br /> 20. CONTRACTOR TO PROTECT IN PLACE THE EXISTING ABOVE AND BELOW GRADE LATERALS DURING <br /> Q SCALE: <br /> o CONSTRUCTION. IF EXISTING PIPING NEEDS TO BE RELOCATED TEMPORARILY DURING CONSTRUCTION, THE AS SHOWN <br /> CONTRACTOR WILL COORDINATE WITH OWNER/ENGINEER. D D SHEET: <br /> SSUEDFolDl7 <br /> 2 <br />