My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:03:45 PM
Creation date
8/16/2023 2:19:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
474
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Q <br /> w <br /> Q <br /> 0 <br /> DRAFT - 2023 FORWARD LANDFILL SINGLE COMPLETION LFG WELL DRILLING SCHEDULE <br /> 0 <br /> 0 <br /> co <br /> 1 • � • • • • � • � - • • • • • • • w <br /> 1 A23-11 2142984.204 6362910.793 125 12 113 27 15 98 97 25 72 3 HDPE SDR 11 <br /> C� 2 A23-12 2142732.037 6363139.733 88 12 76 27 15 61 60 25 35 3 HDPE SDR 11 <br /> 3 A23-13 2142728.690 6362867.338 146 15 131 30 15 116 115 25 90 3 HDPE SDR 11 <br /> 4 A23-14 2142905.727 6362524.761 138 15 123 30 15 108 107 25 82 3 HDPE SDR 11 <br /> 5 A23-15 2142654.978 6362623.451 151 38 113 53 15 98 97 25 72 3 HDPE SDR 11 <br /> 0 <br /> 6 A23-16 2142710.20 6362384.44 133 13 120 28 15 105 104 25 79 3 HDPE SDR 11 z a a a a a a <br /> 7 A23-17 2142388.019 6362596.689 153 19 134 34 15 119 118 25 93 3 HDPE SDR 11 <br /> DDTOTAL 705 698 175 523 21 <br /> z <br /> U) <br /> w <br /> 0 <br /> w (n J <br /> p 0 Z U <br /> = W Q Q <br /> � U <br /> U) 0 E H <br /> J (D Q Q <br /> � w <br /> M 0 <br /> C <br /> O � <br /> 04 LL_O <br /> W � <br /> J Q <br /> W ~ <br /> 0 <br /> ~ ~ <br /> U LL <br /> � W <br /> W � <br /> L <br /> NOTES: W o <br /> �i 1. BASE ELEVATION PER CAD FILE PROVIDED BY TETRATECH DATED JANUARY 19, 2021. IN THE UNLINED AREA, BOTTOM OF WASTE AND DRILL DEPTH ASSUMED TO BE 30 FT MSL BASED ON PERVIOUS CONSTRUCTION ENCOUNTERING BOTTOM OF WASTE IN <br /> o UNLINED AREA AT 20 FT MSL, NO DOCUMENTED BOTTOM OF WASTE INFORMATION AVAILABLE. <br /> N 2. GROUND SURFACE ELEVATIONS WERE SURVEYED BY RUGGERI JENSEN AZAR &ASSOCIATES DATED XXX XX, 20XX. <br /> o <br /> 3. DEPTH OF WASTE IS ASSUMED EQUAL TO THE MATHEMATICAL DIFFERENCE BETWEEN GROUND SURFACE AT THE TIME OF SURVEY AND CALCULATED LANDFILL BASE ELEVATION. SEE NOTES 1 AND 2. <br /> 4. THE WELL DEPTH CALCULATED AS THE WASTE DEPTH MINUS 15 FT PER THE REPUBLIC STANDARD DETAILS FOR TYPICAL LFG WELL COMPLETION. MAXIMUM WELL DEPTH IS 170 FT. cac <br /> 5. ALL WELLS TO HAVE 3 FEET STICKUP, WHICH IS NOT INCLUDED IN THE SOLID LENGTH LISTED IN THE TABLE ABOVE. SOLID PIPE LENGTH IS 25 FEET BELOW THE GROUND SURFACE FOR WELLS ON THE TOP DECK AND 30 FEET BELOW GROUND SURFACE FOR <br /> WELLS AT THE EDGE OF SLOPE. <br /> 6. THIS PROJECT REQUIRES DRILLING OF LANDFILL GAS EXTRACTION WELLS IN A LANDFILL WHICH CONTAINS NON-HOMOGENOUS SOIL AND SOLID WASTE MATERIALS. AS SUCH, DRILLING PROGRESS (RATES) IN LANDFILL CAN VARY GREATLY BASED ON THE <br /> MATERIALS ENCOUNTERED DURING DRILLING. VARIATIONS IN DRILLING RATES WILL NOT BE CONSIDERED A CHANGED CONDITION PER THE CONTRACT DOCUMENTS. cc <br /> 7. WELL SCHEDULE IS TO BE CONSIDERED CONCEPTUAL UNTIL ALL SIGNATURES HAVE BEEN RECEIVED. <br /> C:) <br /> ftv PA0 <br /> W <br /> U z <br /> U w <br /> J <br /> U <br /> N <br /> 0 <br /> DESIGN FIRM QA/QC REVIEWER <br /> L <br /> ACKNOWLEDGEMENT: PRINT NAME SIGNATURE DATE w <br /> z <br /> DESIGN FIRM PROJECT MANAGER <br /> ACKNOWLEDGEMENT: PRINT NAME SIGNATURE DATEw o <br /> w� w <br /> O �Y m2 <br /> GLA PEER REVIEWER <br /> U) Q <br /> PRINT NAME SIGNATURE DATE Q <br /> ACKNOWLEDGEMENT: UJ <br /> Q <br /> ENVIRONMENTAL MANAGER- <br /> CL <br /> J <br /> L PRINT NAME SIGNATURE DATE W <br /> U) 0 <br /> Z c' <br /> CQA INSPECTOR: O z <br /> PRINT NAME SIGNATURE DATEU <br /> i � m m <br /> SURVEYOR ACKNOWLEDGEMENT: � CD <br /> o U <br /> C) PRINT NAME SIGNATURE DATE Z 0 co <br /> LU Ln 0 o <br /> o n � o �Q <br /> DRILLER ACKNOWLEDGEMENT: U <br /> O <br /> o PRINT NAME SIGNATURE DATE o o N <br /> CD <br /> � o <br /> C=> w <br /> � o <br /> elf m o N 2 <br /> N _ o Z <br /> N Q o <br /> cn � z r <br /> WELL SCHEDULE ACKNOWLEDGEMENTS: THE UNDERSIGNED ACKNOWLEDGES THAT HE/SHE HAS REVIEWED THE ABOVE WELL SCHEDULE DATA AND BELIEVES THE INFORMATION TO BE CORRECT TO BEST OF HIS/HER U) Zcc w N m <br /> wcr zn <br /> KNOWLEDGE AND HAS NOTIFIED THE ENGINEER OF DEFICIENCIES OR OMISSIONS. IQ <br /> LQ a <br /> SATE: <br /> Q) 09/05/2023 <br /> cc UNDER NO CIRCUMSTANCES SHALL DRILLING ACTIVITIES BEGIN WITHOUT PROVIDING THE ABOVE SIGNATURES. ANY CHANGES TO WELL LOCATIONS OR DEPTHS SHALL REQUIRE THESE SIGNATURES TO BE OBTAINED AGAIN. <br /> Q CONTRACTOR SHALL GET WRITTEN AUTHORIZATION FROM OWNER AND ENGINEER PRIOR TO DRILLING. SCALE: <br /> o AS SHOWN <br /> DpSHEET: <br /> DFOR <br /> DS1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.