Laserfiche WebLink
PRODUCT LINE INTERSTITIAL <br /> VENT LINE INTERSTITIAL VACUUM LINE TO <br /> VACUUM LINE DISPENSERS,ZONE 3. (END OF LINE) <br /> TO VENT SUMP,ZONE 2. 8 <br /> 12 BRINE RESERVOIR FROM ° F54.1 8 � F55.0 SEE SHEET F52.0 FOR EQUIPMENT LIST 0 <br /> FS4.1 NTERSTITIAL SENSOR FS4.1 DW C OVER PIPE F55.0 RI IN ER TI <br /> 3 BRINE INTERSTITI L VAPOR ZONE 1 <br /> 55 BRINE INTERSTITIAL SENSOR SENSOR 58 <br /> SENSOR 58 Oo 11/2" FLEX CONNECTORS <br /> 58 <br /> DIESEL ZONE 3-VENT+ 51 <br /> CROSSOVER <br /> BRAVO TEST PORT WITH <br /> ° n � d � ° <I. � d• s - <br /> 0 TEST HOSE AND <br /> O o a d ° d <br /> rmr Ill 87 GAS ZONE 1 -VENT+ CONNECTION CAP <br /> I Q I I CROSSOVER O BRAVO FILL PORT <br /> I I I I3 <br /> U A UUM BE S SUMP LIQUID SENS <br /> 59 H9 I I 91 GAS ZONE 2-VENT+ PLACED AT SOTTO 58 <br /> I I II A I xI <br /> I I CROSSOVER OF SUMP ' <br /> PAN SUMP I R R PIP I ----=0 SUMP DBL WALL, 58 <br /> I I SENSOR I 3 I BRINE SENSOR Q <br /> =4'-O" O o <br /> I I 58 I I 0 I o K 12 Architects, Inc <br /> CROSSOVER PIPE 3090 Fite Circle, #104 <br /> DISPENSER <br /> II I I I I TO VENT PIPE- I I ELECTRICAL IS PROVIDED DOUBLE WALLMP 46 Sacramento, CA 95827 <br /> I I ZONE 3 TO THE DISPENSER BY AN PH:(916)455-6500 FAX:(916)455-8100 <br /> OFFSET IN THE SUMP. — VENT SUMP SIMILAR <br /> — SEE DETAIL 20/FS4 FOR SECTION CONSULTANTS: <br /> I I ILl <br /> I I <br /> 3 3 _ _ _ J SUMP MONITORING <br /> PRODUIST LINE D IL ALL PI E TO <br /> FILL UMP T B INS <br /> EST PO WITH TET INTERS I L LLI V4,ICUUM LIN FILL W <br /> ONNE NCAP DSPE IS,ZON NE TO S FOR V: LINE M MONITORING NOTES <br /> W T PORT T T T H <br /> T PORT T TEST H E LU <br /> Z D TUBE�1�4 A CONNE I N AP A CONNE NCAP 0 <br /> SET AT 95°/,OVERFILL LVE 11 11 OOP TBE WITH < CONTRACTOR: <br /> 6� O ALL SENSORS TO BE CONNECTED TO TH TLS 350 PLUS Q <br /> LUS AT 95a 1 <br /> LIG JI0LEVEL 5 G PLU <br /> PR OLQUID LEVE <br /> PROS O THE SYSTEM IS COMPRISED OF VACUUM SENSORS, LIQUID SENSORS AND <br /> O HYDROSTATIC SENSORS. <br /> THE FOLLOWING SENSOR LOCATIONS SHALL BE PROGRAMMED FOR COMPLETE <br /> SYSTEM SHUT DOWN: <br /> ELECTRONIC LINE LEAK DETECTOR(PLLD) <br /> LIQUID DETECTION IN PRODUCT PIPING PROJECT: <br /> LIQUID SUMP SENSORS rr �� <br /> THE FOLLOWING SENSOR LOCATIONS SHALL SET OFF AN AUDIBLE/VISUAL ALARM rl a (�� l IN 0V <br /> INTERSTITIAL HYDROSTATIC AND VACUUM SENSORS B&AAMMMV <br /> OVERFLOW PROBE <br /> LOW/HIGH PRODUCT SENSORS <br /> VAPOR PRESSURE SENSORS <br /> FOR DEADMEN AND - VAPOR FLOW METER <br /> STRAPS SEE DETAIL F56.0 10 <br /> TEST PORTS FOR VACUUM MONITORING SHALL BE AT BOTH ENDS OF ALL ZONES. TPUFjLQATA <br /> DIESEL / 91 UNLEADED FUEL TANK MONITORING A <br /> 18 FUELING CANOPY <br /> SCALE: 1/2" = 1'-0" <br /> 20 18 12 SEE SHEET F52.0 FOR EQUIPMENT LIST 2226 Jackson Avenue <br /> F54.1 BRINE INTERSTI L F54.1 F54.1 Escalon, California 95320 <br /> 58 3 <br /> SENSOR Q BRINE INTERSTITI L <br /> SENSOR 58 <br /> DEVELOPER: <br /> frill <br /> • d a s O <br /> TO VENT LINE INT STITIAL 4"CONDUIT, <br /> II VACUUM SENSOR 60 I TO VENT SUMP,ZINE 1 SCHEDULE 40 <br /> I I TO VAPOR LINE IN ERSTITIAL BRINE RESERVOIR <br /> DBL WALL PIPE TO FILL I A-] TO DISPENSERS,ZJ7NE 1 FROM INTERSTITIAL <br /> SUMP TO BRING VACUUM I I SENSOR 55 <br /> II LINE TO FILL SUMP FOR I <br /> VENT AND VAPOR LINES TEST PORT WITH T ST HOSE <br /> 11 1 73O AND CONNECTIONICAP TO TLS <br /> REVISIONS: <br /> Q SENSOR 58 TEST PORT WITH TEST HOSE A S P <br /> O AND CONNECTION CAP SENSOR 58 I Q PLAN REVIEW CHANGES 12/21/2022 <br /> I I L� <br /> 2Q PLAN REVIEW CHANGES 01/09/2023 <br /> I <br /> 3 FUEL CHANGES 2/03/2023 <br /> QI I 4 TANK CHANGE 2/20/2023 <br /> PRODUCT LINE INTERSTITIAL 5 TANK CHANGE 3-14-23 <br /> VACUUM LINE Q VACUUM SENSOR SS MODULE CHANNEL LENGTH OF 6 EHD-Hazmat Comments 4-7-23 <br /> TO DISPENSERS,ZONE 1. 3 <br /> TEs RT WIT ST HO 0 MONITORING ZONES NUMBER NUMBER ZONE <br /> AND �_TNNECTIGIIs CAP Q PROFESSIONAL SEALS: <br /> w �TZONE 1 - 87 - UNLEADED 1 1 150' <br /> J ZONE 1 - VAPOR 1 2 150' SE�..ARCy� <br /> �G�• ' AGEJyj� .lF <br /> DR TUBE W ZONE 1 - VENT + CROSSOV R 1 3 91OVRFILL'V <br /> SET AT 95%ACNE 11 IC0 H) ZONE 2 - 31 UNLEADED 2 1 136' <br /> MAG LUS ZONE 2- VENT+CROSSOVE 2 2 30' <br /> �., Nov,, 2023 � <br /> LI 5 LEVEL 9jA' Re <br /> PR O 59 ZONE 3 - AUTO DIESEL 3 1 136' of cA�-�F� <br /> O ZONE 3 - VENT + GROSSO R 3 2 74' <br /> O 2/3/2023 <br /> O <br /> PROJECT I PROJECT <br /> 21-004 <br /> 3_4 <br /> -2027 <br /> SHEET CONTENTS: <br /> uii <br /> o PEA GRAVEL MONITORING <br /> DEFLECTOR PLATE BED DEFLECTOR PLATE <br /> SYSTEM <br /> FOR DEADMEN AND <br /> STRAPS SEE DETAIL 56.0 EARTH,TYP. FABRIC LINER IF REQUIRED <br /> ZD 87 UNLEADED FUEL TANK MONITORING O <br /> SCALE: 1/2" = 1'-0" SHEET NUMBER: <br /> FS7mO <br />