My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2226
>
2300 - Underground Storage Tank Program
>
PR0548528
>
INSTALL_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 2:43:27 PM
Creation date
8/24/2023 12:57:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2023
RECORD_ID
PR0548528
PE
2351
FACILITY_ID
FA0000370
FACILITY_NAME
ORLANDOS ESCALON
STREET_NUMBER
2226
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
APN
22727016
CURRENT_STATUS
01
SITE_LOCATION
2226 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
)�X� <br /> II B500 Serie <br /> l <br /> PROBLEM SOLVED Singlewall and ®oublewal <br /> 4'ilt k� SIZES <br /> allD L <br /> J `Ir Small 25.5" <br /> • Large 41.5" LISTED <br /> I UL 2447 <br /> *See page 2 for dimension drawing and dimension chart <br /> MATERIAL <br /> Fiberglass <br /> Epoxy coated galvannealed steel <br /> t' <br /> SPECIFICATIONS <br /> Product Shown quality FRP construction, no need for gelcoat <br /> BSO .-S <br /> for chemical resistance <br /> About the B500 Series "Planter"style raised lid to keep surface water <br /> out <br /> Bravo's 8500 Series Singlewall and Doublewall <br /> transition sumps are compatible with all common Accommodates up to S factory installed AST <br /> motor fuels and can be ordered with standard AST fittings depending on model <br /> fittings pre-installed.The fittings range from <br /> electrical offset(EO) to 3" compression pass-through Factory mounting points make a rack system <br /> AST fittings.This series comes standard with positive installation simple <br /> concrete anchoring and mounting points for optional <br /> rack system. 30-year corrosion warranty <br /> UL2447 listed <br /> Doublewall construction can be monitored with <br /> Bravo Solution Center vacuum or hydrostatically making R triennial <br /> Call or Text (323)541-3851 testing exempt with continuous monitoring <br /> orders@sbravo.com Ships under a continuous 20" Fig vacuum test <br /> n no vative Solutions for Secondary Containment DS-3.01 06-01 <br /> www.sbravo.com 800.282.7286 <br /> -- <br />
The URL can be used to link to this page
Your browser does not support the video tag.