Laserfiche WebLink
Visual Impact Assessment Griffith Energy Storage Project <br /> 6.3.1 Construction <br /> The proposed Project would involve both temporary and permanent changes to the visual character <br /> of the site.Temporary changes are associated with construction activities, including construction <br /> equipment,staging,and Site construction.These visual impacts would be short-term in nature and <br /> are not considered to be significant. <br /> Level of Significance: No significant impact. <br /> 6.3.2 Operation <br /> 6.3.2.1 KOP 1 <br /> The Project would introduce neutral colors,geometric shapes,and horizontal and vertical lines into <br /> the landscape setting.The soundwall is a neutral earth-tone color.The Project would be visible from <br /> this location by a casual observer;see Figure 6.The regular geometric forms and horizontal and <br /> vertical lines associated with the battery storage enclosures,gen-tie line, and associated <br /> infrastructure would result in a visual contrast with the irregular,organic forms of the existing <br /> landform and vegetation.The earth tone color of the sound wall would blend in with the landscape, <br /> especially during the drier months when the surrounding vegetation is predominantly tan.As shown <br /> in the simulation,the surrounding fields are tan in color and the Project blends into the landscape <br /> setting.The existing structures in the vicinity possess horizontal and vertical lines (agricultural <br /> building, Midway Road,fencing,transmission towers and lines,and utility poles and lines). <br /> Particularly,the transmission towers and the fencing in the foreground and the agricultural building <br /> demand attention and are dominant in the landscape.An analysis of potential visual impacts is <br /> summarized in Table 3. <br /> Table 3.Visual Quality Rating Analysis—KOP 1 <br /> Pre-DevelopmentRated Feature Post-Development <br /> in Scores <br /> Landform 1 1 0 <br /> Explanation Project site and surrounding land are flat to Post-development the Project site would <br /> hilly. remain flat to hilly. <br /> Detail No substantial change to the landforms on the Project site would result from Project implementation. <br /> Vegetation 1 1 0 <br /> Explanation Little variation in low-lying grasses with few Low-lying grasses on the Project site would <br /> scattered trees. be reduced.No trees removed. <br /> Detail Both the existing and simulated view show little contrast in vegetation. <br /> Water 0 0 0 <br /> No water is present on the Project site or in The Project would not introduce water to the <br /> Explanation the Project area. Project site. <br /> Detail Neither existing nor simulated views include any water features. <br /> OTETRA TECH 35 August 2023 <br />