Laserfiche WebLink
Compostable Materials Handling Operation and Facility Inspection <br /> Report (93) <br /> SKS Enterprises (39-AA-0050) <br /> 9/6/2023 <br /> inspection, the temperature logs were discussed with the operator. Operator mentioned he will <br /> have staff measure the temperatures prior to turning the compost. Records indicated <br /> temperatures were measured (around 11 am or 1 pm) after the compost was turned. <br /> 2. Per operator, there are approximately 260,000 birds on site. <br /> 3. The composting machine was not running at the time of the inspection. <br /> 4. A lab analysis report was submitted to the EHD on July 19, 2023. The lab analysis report <br /> indicates the compost meets Article 7 requirements. Operator is to provide another lab <br /> analysis report to the EHD by the end of the year. <br /> 5. Fly bait stations observed. <br /> 6. The temperature of the final compost was 120°F. <br /> 7. The following temperatures were measured: <br /> North House: 30 ft 60 ft 90 ft 150 ft 210 ft <br /> North row 88F 11 OF 116F 122F 120F <br /> South row 102F 128F 124F 126F 118F <br /> South House: <br /> North row 120F 118F 122F 131 F 112F <br /> South row 104F 11OF 114F 118F 118F <br /> Attachments <br /> SKS Enterprises Photos <br /> CalRecycle Solid Waste Information System (SWIS) Page 2 of 2 <br /> Date Generated: September 11, 2023 1:59 PM <br />