My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020 - 2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BRANDT
>
23709
>
4400 - Solid Waste Program
>
PR0526053
>
COMPLIANCE INFO_2020 - 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2026 1:28:12 PM
Creation date
10/3/2023 1:24:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020 - 2025
RECORD_ID
PR0526053
PE
4442 - SW COMPOST SITE - QUARTERLY INSPECTION
FACILITY_ID
FA0000771
FACILITY_NAME
SKS ENTERPRISES
STREET_NUMBER
23709
Direction
E
STREET_NAME
BRANDT
STREET_TYPE
RD
City
LODI
Zip
95240
APN
02317008
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
23709 E BRANDT RD LODI 95240
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Compostable Materials Handling Operation and Facility Inspection <br /> Report (93) <br /> SKS Enterprises (39-AA-0050) <br /> 6/13/2024 <br /> Notes: <br /> 1. The previous Area of Concern for Pathogen Concentrations & Reduction Methods has been <br /> removed. Operator is working on the temperatures. There have been numerous days the <br /> temperature of the active compost has been at or above 131 OF. Operator has purchased a <br /> new digital thermometer to accurately record temperatures. <br /> 2. Operator is to provide EHD with a lab analysis report on or before December 31, 2024. <br /> 3. The composting machine used for North House — South row is broken. Operator is in the <br /> process of having the machine repaired. All compost material previously in the North House — <br /> South row will go through the composting process once the machine is fixed. Currently, the <br /> material is piled within the house. <br /> 4. There was no final compost on site, during the inspection. <br /> 5. The following temperatures were measured: <br /> North House: 30ft 60ft 90ft 150ft 21Oft <br /> North row 98F 112F 112F 11OF 105F <br /> South row <---------------NONE------------------> <br /> South House: <br /> North row 96F 111F 106F 106F 105F <br /> South row 82F 11OF 11OF 112F 124F <br /> Attachments <br /> SKS Enterprises Photos <br /> CalRecycle Solid Waste Information System (SWIS) Page 2 of 2 <br /> 1..__ nA Il 11'1A 'I.AA MR <br />
The URL can be used to link to this page
Your browser does not support the video tag.