Laserfiche WebLink
WALTON <br /> RNGINEERING, INC. <br /> Overfill Prevention Inspection- OPW 61 and 71 Series Devices <br /> Date: <br /> Owner. <br /> Facility: <br /> OPW Overfill Model Number: <br /> Part 1 -Proper Height Setting Calculation <br /> Tank 1 Tank 2 Tank 3 Tank 4 <br /> Maximum Tank Volume Per: A Gallons 9BW <br /> Max shut off requirement for flapper is 95% B 95% 1176 <br /> Multiply Max tank volume by 95% C Gallons '76, <br /> Use tank chart or ATG to determine height of D Inches 6 3�J <br /> calculated volume <br /> Measure top of fill riser threads,or face seal E Inches <br /> adapter <br /> Tank diameter(From Tank Chart) F inches 01-!! '75 <br /> Upper Tube in Tank(G)F-D=G G Inches <br /> Subtract 2"from upper tube in tank G-2"=K K Inches <br /> Calculated minimum upper tube length(1) t Inches <br /> K+E=I <br /> Actual measured upper tube length(Without d Inches <br /> fill adapter) ( <br /> Fart 2-Device C%rtification Criteria Evaluation <br /> Does the overfill prevention device meet the 95% <br /> requirement? <br /> Is the actual measured upper tube length 6.5 inches or <br /> more than the fill riser?(J must be 6.5"or more than E) <br /> Does the overfill prevention device function as required? <br /> (Inspect the device for damage,contamination,freedom of <br /> movement,weakening due to wear and corrosion <br /> Device Overfill Certification PASS/FAIL <br /> Drop Tube Testing PASS/FAIL <br /> Technician certifles that the device is operationally compliant. <br /> Signature of Technician: Date: <br /> Technician's Name: <br />