My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
18095
>
2300 - Underground Storage Tank Program
>
PR0548699
>
INSTALL_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 3:23:19 PM
Creation date
10/3/2023 5:01:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2023
RECORD_ID
PR0548699
PE
2351
FACILITY_ID
FA0027873
FACILITY_NAME
ARCO AMPM-MOUNTAIN HOUSE
STREET_NUMBER
18095
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
Zip
95391
CURRENT_STATUS
03
SITE_LOCATION
18095 W GRANT LINE RD
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
°• Environmental Health Department <br /> �. �J r� SHAWN <br /> t 7Y - L. <br /> Y <br /> ttlir- ' COUNTY— <br /> Greol less grows he: . . <br /> Underground Storage Tank Program Service Request Inspection Report <br /> Name of Facility: ARCO AM-PM MOUNTAIN HOUSE Date: 10/31/2023 <br /> Address: 18095 W GRANT LINE RD , MOUNTAIN HOUSE 95391 <br /> Requestor: ALEX G CUEVAS/RAJA CHANDI, RAJA CHANDI GROUP Telephone: (213)448-3911 <br /> Program Element: 2303-UST/PIPING INSTALLATION Request#: SR0083410 <br /> Inspection Type: 298-UST SERVICE REQUEST- FIELD ACTIVITY <br /> Onsite Service Technician: Engel Molina ICC Service Tech/Installer Exp. Date: 06/23/2024 <br /> Manufacturer training: Modern Welding, 12/20/24; NOV, 04/26/24 <br /> OVERALL INSPECTION NOTES AND COMMENTS <br /> NOTES <br /> Witnessed primary tank test(one hour pressure test at 3psi )on the following tanks: <br /> -25,000 gallon 87 tank-passed <br /> - 12,000 gallon 91 tank-passed <br /> -8,000 gallon diesel tank-passed <br /> -Verified secondary piping slope test for all piping at tank pit-87, 91 and diesel, (product,vent,vapor recovery at 1/8 inch <br /> per foot or greater to the containment sumps. <br /> -Verified piping burial depth, set back and cross overs at tank pit for(87, 91 and diesel).This facility is not approve to receive <br /> fuel in the tanks or operate the UST system. <br /> Additional inspections are required. Please see approval letter dated June 28, 2023. Make sure to submit required inspection <br /> in writing to the ust@sjgov.org with a 48 hours advanced notice. <br /> To minimize person to person contact EHD is choosing to write the name of person receiving the report instead of having sign. <br /> The person in charge is responsible for ensuring that the above mentioned facility is in compliance with all applicable sections of the California Health and <br /> Safety Code.If a reinspection is required,fees will be assessed at the current hourly rate. <br /> Received by: Name and Title: Email report to: Raja Chandi, Owner <br /> EH Specialist: PAUL NSO Phone: (209)616-3049 <br /> SR0083410 SC298 10/31/2023 <br /> EHD 23-01 Rev.07/05/2022 Page 1 of 1 Underground Storage Tank Program Service Request Inspection Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.