Laserfiche WebLink
RECEIVED <br /> ► R 2 7 1093 B500 Series <br /> BRAVO ENVIRONMENTAL <br /> PROBLEM SOLVED HEALTH r - . • TMENTS *1 nglewall and Doublewall <br /> Large 41 . 5 " LISTED <br /> TRANSITION SUMPS <br /> SIZES U0 <br /> Small 25 . 5" <br /> UL . , <br /> *See page 2 or dimension drawing and d <br /> MATERIAL <br /> Fiberglass <br /> Epoxy . . - . steel <br /> SPECIFICATIONS <br /> Product Shown 61 Quality FRP construction, no need for gelcoat <br /> for chemical resistance <br /> About the B500 Series " Planter" style raised lid to keep surface water <br /> out <br /> 11 Series SinglewallDoublewall <br /> transition sumps are compatible with all common Accommodates - . AST <br /> motor fuels and can be ordered with standard AST fittings depending on model <br /> fittings pre� installecl . The fittings range from <br /> electrical offset • compressionAST fittings . This series comes standard with . . <br /> anchoringconcrete points for optional <br /> rack system . N <br /> 30�year corrosion warranty <br /> UL2447 listed <br /> Doublewall constructionbe monitored with <br /> Bravo Sol utionor hydrostatically <br /> exemptCall or Text (323) 541� 3851 testing • • us monitoring <br /> orders@sbravo, com Ships • - • • 1 <br /> " Hg vacuum test <br /> Page1 ' of2 � ntlOVatIVE' ' SO � UtI,OnS �Of;$ CCOnC� aY�/ C011ta1f11112t1t DS-3 .01_06.01 ' <br /> www. sbravocom � ' 800. 282 . 7286 <br />