Laserfiche WebLink
BELOW GROUND PRODUCTS www. opwgiobal . com <br /> OPW 7150 Overfill Materials Important <br /> Prevention Valves In order to prevent product <br /> Valve Body : Cast aluminum spillage from the Underground <br /> The CARB -certified OPW 71 SO Float : Nitrile rubber, closed cell foam maiStorage Tank ( UST), properly <br /> ment <br /> vapor-tight Overfill Prevention Valve ndna propetained r cl connection at the <br /> is designed to prevent the overfill of Valve : Aluminum tight-fill adaptor are essential . <br /> underground storage tanks by providing Seals : Viton ® I Delivery personnel should <br /> e managed and trained <br /> a positive shut- off of product delivery. Upper & lower Drop Tube : Aluminum bb inspect delivery elbows <br /> The shut-off valve is an integral part of Plastic parts : Acetal and hoses for damaged and <br /> the drop tube used for gravity filling . missing parts. They should <br /> The OPW 71 SO allows easy installation Hardware : Stainless steel $Q always make certain there <br /> is a positive connection <br /> (without breaking concrete) and requires Features between the adaptor and <br /> no special manholes. elbow. If delivery equipment <br /> ♦ Simple, Easy and Quick is not properly maintained, <br /> The 0 P 71 SO is a vapor-tight two- Installation — no excavation or or the elbow is not securely <br /> stage shut- off valve. When the liquid coupled to the adaptor, a <br /> 9 q special manholes required . serious spill may result when <br /> level rises to about 95 % of tank ♦ Economical — costs a fraction the OPW 71 SO closes, causing <br /> capacity, the valve mechanism is of expensive, complicated and a hazard and environmental <br /> , <br /> released , closing automatically with p p contamination . <br /> the flow. This reduces the flow rate to difficult-to- install valves. <br /> approximately 5 gpm through a bypass ♦ Furnished Complete — supplied NOTE : The OPW 71 SO is <br /> designed for use on tight-fill <br /> valve. The operator may then stop the with new upper and lower drop tubes, gravity drop applications only. <br /> filling process and disconnect and drain mounting hardware and thorough Do not use for pressure <br /> the delivery hose. As long as the liquid instructions for quick job site time. fill applications. <br /> exceeds the 95 % level , the valve will ♦ Completely Automatic Operation <br /> close automatically each time delivery — no prechecks to perform , no resets ♦ Retrofits Directly — for both new <br /> is attempted . and no overrides to be broken and existing tanks with 4 " fill risers. <br /> If the delivery is not stopped and the or abused . ♦ Quick Drain Feature — <br /> liquid rises to about 98 % of tank ♦ No Pressurization of the Tank — automatically drains hose when head <br /> capacity, the bypass valve closes operates directly from liquid level . pressure is relieved . <br /> completely. No additional liquid can flow ♦ Will Accept a Dipstick ♦ Best Flow Rate in The Industry * <br /> into the tank until the level drops below <br /> a reset point. for Gauging * OPW Test Lab results <br /> NOTE : The 71 SO Overfill Prevention <br /> Valve can be adjusted to shutoff at any Advantages of Overfill Prevention <br /> desired tank capacity. Please contact the Compared to Overfill Warning Systems : <br /> Authority Having Jurisdiction (AHJ ) and ♦ Completely Automatic faster fill times and reducing <br /> review local, state, and national codes to Operation — does not rely on the spill risk . <br /> determine the regulatory requirements alertness or speed of response of the ♦ Speeds Delivery Operations <br /> governing shut-off capacity in your delivery attendant for certainty of — product flows unimpeded into <br /> region , as well as take into account overfill prevention . the tank until the hose " kick " that <br /> other considerations such as extreme <br /> tank tilt. In all cases, the upper tube ♦ Keeps the Top of UST " Dry, " accompanies the valve shut-off <br /> must protrude into the tank at least per EPA Requirements — provides a clear signal that the <br /> 6 1 /2 " to ensure that the valve can shut eliminating possible leaks at loose liquid has reached the shut-off level . <br /> off flow into the tank completely before bung fittings and the need for ♦ Simple and Inexpensive <br /> the top of the tank is wetted as per double containment on vent lines. Installation — in both two-point <br /> EPA requirements. ♦ Does Not Rely on Pressure in and coaxial fill applications, no <br /> the UST to Stop Flow — allowing additional excavation , manholes or <br /> 71 SO Instruction Sheet Order vent piping are required . <br /> Number: H15524PA <br /> Look for this label for RECEIVED <br /> Listings and e— U C t � authentic OPW EVR <br /> (a Alt . Approved products. <br /> Certifications Resources i � Board OPW 7150M is EVR Approved for E85 MAR <br /> - 2 7 2023 <br />