<br /> TANK AND PIPING INSTALLATION NOTES Q
<br /> - Uaoakana Landscape Z
<br /> rn
<br /> Fnllcla a '
<br /> ve U - -.'
<br /> Mau ntainHouse 1 ) INSTALL ONE (1) 25K REGULAR UNLEADED, ONE (1) 12K/8K PREMIUM UNLEADED/DIESEL DUAL COMPARTMENT DOUBLE WALL STEEL TANKS WITH CONTINUOUS
<br /> WelcoeCenter I += MONITORING BY "VEEDER ROOT" TLS-350 PLUS TANK AND PIPING MONITOR AND ALARM SYSTEM. ALL TANK SUMPS SHALL BE DOUBLE WALL FROM COLLAR TO THE
<br /> Mosta"gal' P n I BOTTOM OF TANK SLAB. SUMPS SHALL BE INDIVIDUALLY CONTINUOUSLY MONITORED BY "VEEDER ROOT" SENSORS TIED INTO THE TLS-350 PLUS TANK & PIPING F_
<br /> t Fns 9°" MONITOR AND ALARM SYSTEM PER LG-162-1 REQUIREMENTS. TANKS TO BE SET MIN. 50" BELOW FINISH GRADE. FOR ADDITIONAL INFORMATION. TANK INSTALLATION a
<br /> Y'^TIn h1'P �
<br /> `g°a`°`"4 SHALL BE IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. INSTALL WITH FILTER FABRIC. W
<br /> Mountain 110use w.
<br /> atm.Ll�e. a
<br /> High SCI]VFII T � U
<br /> pd,I�PI 3 MB�A"e Yea GI Nfd�^rye^C�.°^ Ell
<br /> Z
<br /> gdlnerDr - � - `° ® (: INSTALL A 8" MIN. REINFORCED CONCRETE SLAB OVER TANKS. SURFACE WATER SHALL BE DIVERTED AWAY FROM EACH MANHOLE BY FORMING A CONCRETE CROWN
<br /> EFW��LAtV art ® Wu WITH A 1-1/2" DROP IN 18" FROM THE EDGE OF THE MANHOLE RING TO THE SURROUNDING SLAB ELEVATION. TANK SLAB SHALL BE THICKENED AT TANK SUMPS TO O
<br /> tF
<br /> p °1 ¢ cPEreaa"o s BE JUST BELOW TOP OF TANK SUMP'S SECONDARY CONTAINMENT TERMINATION PER AB-2481 REQUIREMENTS. CONSTRUCT SLAB PER CIVIL SLAB INSTALLATION V
<br /> DETAILS.
<br /> ' rel^���-n9v - - - - ? e Z
<br /> ■
<br /> COM^5C
<br /> O3 INSTALL FOUR (4) 4" EVR PHASE I APPROVED DUAL POINT FILL ADAPTERS AND CAPS. INSTALL 3 DROP TUBES WITH FLAPPERS. (GAS AND DIESEL) UI
<br /> ns irate a+j
<br /> AI10 by Sigraa•#ure Homes mt Arl e ®INSTALL THREE (3) 4" EVR PHASE I APPROVED DUAL POINT STAGE I VAPOR RECOVERY ADAPTERS AND CAPS. (GAS ONLY) U)
<br /> Quse seri_
<br /> ( INSTALL ONE (1) 4 HP VARIABLE SPEED TURBINE IN THE 25,000 GALLON REGULAR UNLEADED TANK (TANK #1). 0 2 EO
<br /> CITE
<br /> 41G�ant'LLneFd WGMT1tLkieR1J ENTER e INSTALL ONE (1) 2 HP VARIABLE SPEED TURBINE IN THE 12,000 GALLON UNLEADED PREMIUM TANK COMPARTMENT (TANK #2) M_
<br /> INSTALL ONE (1) 2 HP VARIABLE SPEED TURBINE IN THE 8,000 GALLON DIESEL TANK COMPARTMENT (TANK #3) V -a rn N
<br /> Wr+rruneAd © NitslG O NOT e TURBINE SYSTEMS TO BE EQUIPPED WITH 3 GPH ELECTRONIC LINE LEAK DETECTION. LEAK DETECTORS ARE TO BE TESTED FOR THE 3 GPH LEAK DETECTION PRIOR TO U
<br /> I START UP. CONTRACTOR TO PROVIDE TEST DATA AT THE TIME OF PUNCH LIST AS WELL AS INCLUDE IN CLOSE OUT BINDER. SET TURBINE INTAKES AT 5" FROM co
<br /> Century Communities BOTTOM OF TANKS. TURBINES TO BE EQUIPPED WITH INTAKE FILTER SCREENS. CONTRACTOR IS TO LABEL TURBINES AND CONTROLLERS AS TO WHICH PRODUCT THEY Q p •cd C°
<br /> C egePark.at•.. C-STORE e SERVE. GREEN CONTROLLER LIGHTS ARE TO GO OUT WHEN TURBINES ARE OFF OR LOSE POWER. o Q ai
<br /> � � � 6 N a� � c
<br /> Mountain Haus@ Q INSTALL 3" INSIDE 4" DOUBLE WALL FIBERGLASS STAGE II VAPOR RECOVERY HEADER FOR "EVR BALANCE" ORVR/PHASE II EVR COMPATIBLE VAPOR RECOVERY N co > a
<br /> SYSTEM. SLOPE 1/8" PER FOOT MINIMUM TO TANKS. LAYOUT TANKS & STAGE II VAPOR RECOVERY PIPING SUCH THAT THE STAGE II PIPING DRAINS & ENTERS INTO
<br /> N e REGULAR UNLEADED TANK FIRST W/ 3" CONNECTIONS, AND CONTINUES 3" TO OTHER TANKS.
<br /> INSTALL 3" TO 2" REDUCING TEES WHERE HEADERS BRANCH TO DISPENSERS. CONTRACTOR TO INSTALL TRACER WIRE WITH VAPOR PIPING. TESTING OF VAPOR LINES
<br /> SHALL BE PERFORMED PRIOR TO BACKFILL, PRIOR TO PAVING AND BEFORE STATION OPERATION. THE VAPOR LINE'S INTERSTITIAL SPACE SHALL BE CONTINUOUSLY
<br /> VICINITY MAP VACUUM MONITORED PER LG-162-1 REQUIREMENTS. THE CONNECTION FOR THE VACUUM MONITORING SHALL BE LOCATED IN THE TANK TURBINE SUMPS. m
<br /> SCALE:N.T.S.
<br /> LTI id-7' III (: INSTALL 2" INSIDE 3" DOUBLE WALL FIBERGLASS GASOLINE SUPPLY LINE AND DOUBLE WALL FIBERGLASS DIESEL SUPPLY LINE TO DISPENSERS. PIPING SHALL BE
<br /> INSTALLED PER MANUFACTURER'S SPECIFICATIONS AND INSTRUCTIONS. PIPING SHALL BE INSTALLED WITH A SLOPE OF 1/8" PER FOOT FROM THE FURTHEST
<br /> DISPENSER SUMP DOWN TO THE TURBINE SUMPS. CONTRACTOR TO INSTALL TRACER WIRE WITH PRODUCT PIPING. TESTING OF PRODUCT LINES SHALL BE PERFORMED
<br /> PRIOR TO BACKFILL, PRIOR TO PAVING AND BEFORE STATION OPERATION. PRODUCT LINES INTERSTITIAL SPACES SHALL BE CONTINUOUSLY VACUUM MONITORED PER
<br /> IF
<br /> LG-162-1 REQUIREMENTS AND TIED INTO THE "VEEDER-ROOT" TLS-350 PLUS CONSOLE. SEE DETAILS FOR CONNECTION LOCATIONS AND VACUUM ZONING DATA.
<br /> CAUTION: 1 ® INSTALL "VEEDER ROOT" TANK AND LINE ALARM CONTROL PANEL MODEL # TLS-R IN BUILDING AT NORMALLY OCCUPIED LOCATION IN BUILDING. SEE ARCHITECTURAL
<br /> POTENTIAL UTILITY CONFLICT. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING AND AND ELECTRICAL DRAWINGS FOR EXACT LOCATION.
<br /> NEW UTILITIES PRIOR TO CONSTRUCTION. SEE UTILITY CONFLICT NOTE THE ENTER EXISTING WATER, STORM, AND SANITARY SEWER SERVICE SHOWN IS APPROXIMATE, ■ INSTALL THREE (3) 2" INSIDE 3" DOUBLE WALL FRP VENT LINES. SLOPE 1/4" PER FOOT (1/8" PER FOOT MINIMUM) TO TANKS AS SHOWN. CONTRACTOR TO INSTALL
<br /> BASED ON FIELD SURVEYS AND "AS-BUILT" RECORDS. THE GENERAL CONTRACTOR TRACER WIRE WITH VENT PIPING. THE INTERSTITIAL SPACE OF EACH OF THE VENT LINES SHALL BE CONTINUOUSLY MONITORED VIA A VACUUM SENSOR TIED INTO THE
<br /> SHALL "POTHOLE" THE EXISTING UTILITIES TO VERIFY THE DIAMETER AND LOCATION DO NOT No "VEEDER-ROOT" TLS-350 PLUS CONSOLE PER LG-162-1 REQUIREMENTS. THE DOUBLE WALL VENT PIPING SHALL BE TERMINATED IN A DOUBLE WALL VENT
<br /> (INCL. ELEVATIONS) PRIOR TO CONSTRUCTION. ANY DISCREPANCIES IN THE © EMERGENCY PUMP TERMINATION SUMP THAT WILL BE HYDROSTATICALLY MONITORED AND WILL ALSO HAVE A LIQUID SENSOR INSTALL PER LG-162-1 REQUIREMENTS.
<br /> LOCATION OF THE EXISTING PIPE OR INCOMPATIBILITY OF THE DESIGN SHALL BE
<br /> BROUGHT TO THE IMMEDIATE ATTENTION OF THE OWNERS REPRESENTATIVE, AND 10 TERMINATION POINT OF TANK VENTS TO BE A MINIMUM OF 12' ABOVE GRADE AND NOT WITHIN 5' FROM ANY BUILDING OPENING OR PROPERTY LINE THAT CAN BE
<br /> OWNERS CIVIL ENGINEER. ANUBUILT UPON. VENT RISERS SHALL BE INSTALLED IN ACCORDANCE WITH UNIFORM FIRE CODE REQUIREMENTS. INSTALL TWO (2) 1" CONDUITS FROM GASOLINE VENT
<br /> SWITCH (INDOOR RISER TO BUILDING FOR ISD MONITORING REQUIREMENTS. INSTALL VEEDER-ROOT CARBON CANISTER AND ASSOCIATED PIPING AND FITTINGS PER NEW CARB EVR
<br /> OUTDOOR PHASE II STANDARDS AND E.O. INSTALLATION SHALL BE PER CARB E.0 AND MANUFACTURERS INSTRUCTIONS. Z
<br /> &
<br /> UTILITY CONFLICT NOTE ) o
<br /> 11 INSTALL THREE (3) RIGID CONDUITS FOR SUBMERSIBLE PUMP POWER. (ONE FOR EACH TURBINE). NOTE THAT THE LAST 2 FEET OF ALL CONDUIT ENTERING TURBINE, N
<br /> CAUTION FILL, DISPENSER OR VENT TRANSITION SUMPS SHALL BE PVC COATED RIGID CONDUIT. j
<br /> THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, GILBARC�WO HOSES LIJ
<br /> DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PER SID BLENDING � 12 NOT USED �
<br /> PLANS OR NOT BY POT HOLING THE UTILITIES AND SURVEYING THE HORIZONTAL GILBARCO SINGLE 3+1 PRODUCT MPD
<br /> AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLING WITH DIESE�TYP. 2) 13 NOT USED
<br /> UTILITY LOCATE ® 1 (800) 227-2600 AND THEN POT HOLING ALL OF THE -13tEN&fdG-3-4rO
<br /> EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY PRODUCT MPD 14 INSTALL .1 GPH MAG PROBE TANK LEVEL GAUGES AT LOCATIONS SHOWN.
<br /> VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS
<br /> SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION 'bI
<br /> AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR , I, 15 TANKS SHALL BE PROPERLY MARKED AND TAGGED WITH STANDARD API IDENTIFICATION MARKINGS AND BRASS TAGS AT FILL MANHOLES.
<br /> SHALL CONSULT THE OWNERS CIVIL ENGINEER TO RESOLVE ALL PROBLEMS PRIOR +1','I 3+0'• I _ I ' 3+0 I ' 3+0 I +1
<br /> TO PROCEEDING WITH CONSTRUCTION. I �£ I I s I I s I I 0 sl I 16 INSTALL (6) GILBARCO (3+0) SINGLE HOSE PER SIDE & (4) GILBARCO (3+1) DUAL HOSE PER SIDE, MULTI-PRODUCT DISPENSERS AS SHOWN. DISPENSERS TO BE
<br /> Co C00 CD I. FITTED WITH "BALANCE" ASSIST STAGE II HOSES, NOZZLES AND BREAKAWAY VALVES PER NEW CARB EVR AND ISD PHASE II EXECUTIVE ORDER VR-204
<br /> TANK EXCAVATION NOTE III I I14, 11 DW FRP (VAPOR) III c' III REQUIREMENTS. DISPENSERS SHALL BE EQUIPPED FROM MANUFACTURER WITH HEALY PUMPS & VEEDER-ROOT ISD FLOW METERS. CONTRACTOR IS RESPONSIBLE FOR
<br /> A m � m I INSTALLING HOSES, NOZZLES AND BREAKAWAYS. INSTALL UNDER DISPENSER CONTAINMENT INCLUDING PRODUCT AND VAPOR SHEAR VALVES AND MONITORING
<br /> ' I I •'TYP, 18 6 I A I`
<br /> �1 � £�al SENSORS. DISPENSER SUMPS SHALL BE DOUBLE WALL TO AT LEAST THE BOTTOM OF CONCRETE DRIVE SLAB AND HYDROSTATICALLY MONITORRED PER LG-162-1
<br /> I I COMPLIANCE OPTION. THE LAST 2 FEET OF ALL CONDUITS ENTERING THE DISPENSER SUMPS SHALL BE PVC COATED RIGID. START UP BY MANUFACTURER
<br /> TANK EXCAVATIONS SHALL BE PER OSHA REQUIREMENTS AND BE PERFORMED
<br /> FOLLOWING THE RECOMMENDATIONS OF THE SOILS REPORT. TANKS III III III o I I II'I O REPRESENTATIVE. GENERAL CONTRACTOR TO PURGE LINES WITH A MINIMUM OF 200 GALLONS THROUGH EACH HOSE/NOZZLE. ANY AIR POCKETS OR START UP
<br /> PROBLEMS DUE TO IMPROPER INSTALLATION OR INCORRECT WIRING THAT DESTROYS ELECTRONICS WILL BE BILLED BACK TO THE CONTRACTOR. AFTER PURGING THE La
<br /> EXCAVATIONS THAT REQUIRE SHORING SHALL BE ENGINEERED AND PERMITTED
<br /> SEPARATELY AND SHALL BE THE RESPONSIBILITY OF THE INSTALLING GILBARCO TWO HCSIJS e� £ ae PRODUCT LINES OF AIR AND BEFORE VAPOR RECOVERY TESTING, CONTRACTOR IS TO REPLACE THE FACTORY INSTALLED GASOLINE FILTERS WITH NEW FILTERS. Q
<br /> CONTRACTOR. HIGH WATER TABLE IS ANTICIPATED. CONTRACTOR TO SHORE PER SIDE BLENDING ',II "• I I -' I -' �
<br /> AND DEWATER TANK HOLE EXCAVATION. FOLLOW TANK MANUFACTURER'S 3+1 PRODUC' F11D �I,£ - FILL AND STAGE I VAPOR RECOVERY RISERS & ANNULAR RISER SHALL BE GROUNDED TO PREVENT STATIC DISCHARGE DURING FILLING OPERATIONS.
<br /> INSTALLATION INSTRUCTIONS FOR WET HOLE TANK INSTALLATION. WITH DIESEL TYP 2 ��$" � J�- - - 1 8 PER FT.
<br /> W-9.-V.-W-Y.-VA M-VA-M-M ' -W-w 9'W-Y.-Wl-W-Y. VA c
<br /> ( -. - 9. ^ ZZI -. 1 18 ALL NEW PIPING AND TANKS TO BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS AND INSTALLATION INSTRUCTIONS. CONTRACTOR SHALL USE FLEXIBLE Z
<br /> 18 TYP. CONNECTORS FROM THE TANK SUMP TO THE VAPOR RECOVERY MANIFOLD AND MAIN PRODUCT LINES OR SHALL PROVIDE AT LEAST 4 FEET OF STRAIGHT FRP PIPE
<br /> GENERAL NOTES DW FRP (VAPOR) RUN BEFORE A CHANGE OF DIRECTION OF MORE THAN 30 DEGREES.
<br /> PIPING LEGEND FILL
<br /> 87 OCT. 19 INSTALL OVERFILL ALARM & ACKNOWLEDGMENT SWITCH, ESO AND MAINTENANCE RECEPTACLE IN LOCATION SHOWN. ALARM AND SWITCH TO BE LOCATED TO PROVIDE
<br /> P P P P DW FRP FIBERGLASS PRODUCT PIPING NEW CONCRETE 0 ZUNLEADEDL ANNULAR AN UNOBSTRUCTED VIEW TO TRUCK DRIVER. PROVIDE BOLLARD PROTECTION OF FREE STANDING POLE.
<br /> i
<br /> -VA VA -VA -VA - FIBERGLASS VAPOR RECOVERY PIPING PRODUCT) TANK SLAB , SENSOR (TYP.) 20 FINAL FACILITY EQUIPMENT LOCATIONS TO BE APPROVED BY DISTRIBUTION PRIOR TO SUBMITTAL FOR PERMITS TO ENSURE CLEAR AND SAFE ACCESS TO THE
<br /> FIBERGLASS VENT PIPING 7 TYP. FILL FILL i UNDERGROUND TANKS FOR UNLOADING OPERATIONS.
<br /> «^ 0
<br /> 91000CT.
<br /> GA. «> «^LDESEII
<br /> ,
<br /> NOTE: DI0001
<br /> -Ed
<br /> Ges
<br /> CONTRACTOR ASSUMES RESPONSIBILITY TO ASSURE THAT THE OPERABLE SYSTEM �,' GAL. I �_ J NOTE: ALL TANK, VENT & DISPENSER CONTAINMENT SUMPS MUST BE EQUIPPED WITH VEEDER-ROOT 2-IN-1 SENSOR BOXES
<br /> MEETS THE DESIGN INTENT AND THE CONTRACTOR IS PERMITTED TO ADJUST (3) 2" DIA. GALV. STEEL VENT
<br /> PIPING LOCATIONS BASED ON ACTUAL FIELD CONDITIONS AND INSTALLATION PEIZTOSSBADE-
<br /> TECHNIQUES. AINT TO ATCH SITE CONDITIONS
<br /> * PRODUCT, VAPOR AND VENT PIPING IS TO SLOPE TOWARD TANK 1/8" PER FOOT ROUTE (2) SPARE 1" CONDUITS 1APOR LINE
<br /> MINIMUM, 1/4" PER FOOT PREFERRED. IF INSTALLED, SIPHON PIPING TO SLOPE TO INTRIN CALLY SAFE WIREWAY GENERAL COMPLIANCE NOTES
<br /> 1/4" PER FOOT.
<br /> VENT & STAGE II
<br /> * SECONDARY CONTAINMENT PIPING IS SHOWN BY NOTE ONLY, NOT GRAPHICALLY. DW FRP (VENT) gI VAPOR RETURN (TYP.)
<br /> ALL PRODUCT PIPING TO BE DOUBLE CONTAINMENT PIPE. VENT AND VAPOR 1. ARCHITECTURAL AND CIVIL DRAWINGS SHALL TAKE PRECEDENCE FOR REFERENCING ALL DIMENSIONS, PROPERTY LINES, ELEVATIONS AND EQUIPMENT LOCATIONS
<br /> RECOVERY SHALL BE DOUBLE WALL.
<br /> 2. ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE FIELD BEFORE STARTING ANY WORK. ANY DISCREPANCY SHALL BE CALLED TO THE
<br /> ATTENTION OF THE OWNERS ENGINEER FOR HIS DECISION BEFORE PROCEEDING WITH THE WORK. p . p
<br /> DISPENSER WARNING SIGNS 1 3. GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM APPLICABLE AGENCIES FOR EXCAVATIONS OF TRENCHES 5'-0" OR MORE IN DEPTH INTO WHICH A
<br /> PERSON IS REQUIRED TO DESCEND.
<br /> WARNING SIGNS- PROVIDE WARNING SIGNS IN T 4. AN UNAUTHORIZED RELEASE RESPONSE PLAN MUST BE SUBMITTED AND APPROVED BY GOVERNING AGENCY PRIOR TO TANK OPERATIONS.
<br /> ACCORDANCE WITH SECTION 2205.6 THAT STATE;
<br /> a. NO SMOKING 5. ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE AS PER NATIONALLY RECOGNIZED CODES, LOCAL CODES AND GOVERNING AUTHORITIES.
<br /> c. DISCHARGE YOUR STATIC ELECTRICITY BEFORE. SHUT OFF MOTOR OVERFILL ALARM/STROBE INSTALL VEEDOR-ROOT L�
<br /> c
<br /> FUELING BY TOUCHING A METAL SURFACE AWAY - 6. THE UNDERGROUND STORAGE TANK SYSTEM SHALL BE COMPATIBLE WITH THE PRODUCT STORED.
<br /> FROM THE NOZZLE. SWITCH CARBON CANISTER VAPOR
<br /> d. TO PREVENT STATIC CHARGE, DONOT REENTER 7. ALL MONITORING DEVICES SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS.
<br /> YOUR VEHICLE WHILE GASOLINE S PUMPING, IF INSTALL EMERGENCY PUMP SHUTOFF POLISHER. INSTALLATION SHALL
<br /> A FIRE STARTS, DO NOT REMOVE NOZZLE-BACK SWITCH AND WEATHER PROOF OUTLET BE PER MANUFACTURERS 8. GENERAL CONTRACTOR IS REQUIRED TO PROVIDE 5 WORKING DAY NOTIFICATION TO GOVERNING AGENCY PRIOR TO TANK INSTALLATION. Z
<br /> AWAY IMMEDIATELY.
<br /> e. IT IS UNLAWFUL AND DANGEROUS TO DISPENSE PER FIRE CODE REQUIREMENTS INSTALLATION INSTRUCTIONS _
<br /> GASOLINE INTO UNAPPROVED CONTAINERS. 9. TANK AND PIPING SYSTEM TO BE INSPECTED BY OWNER'S THIRD PARTY INSPECTOR & GOVERNING AGENCY AT FOUR (4)
<br /> f. NO FILLING OF PORTABLE CONTAINERS IN OR ON A - - - SEPARATE CONSTRUCTION PHASES (SEE SPECIFICATIONS): J
<br /> MOTOR VEHICLE. PLACE CONTAINER ON A. TANK AIR TEST BEFORE SETTING IN HOLE AND SOAP TEST.
<br /> GROUND BEFORE FILLING.
<br /> B. TANKS AND PRIMARY PIPING PNEUMATICALLY TESTED FOR 30 MINUTES.
<br /> C. INSPECTION OF ALL SECONDARY CONTAINMENT, INCLUDING TESTING, IN ACCORDANCE WITH
<br /> SENSOR MATRIX MANUFACTURER'S GUIDELINES. LIJ
<br /> D. FINAL INSPECTION INCLUDING ALL PORTIONS OF THE LEAK DETECTION SYSTEM.
<br /> SENSOR TURBINE SHUT-OFF AUDIBLE/VISUAL ALARM - - - 10. ALL TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE HYDROSTATICALLY TESTED (LAKE TEST) WITH STANDING WATER TO TOP OF REDUCING
<br /> DISPENSER LIQUID SUMP SENSORS X X - COLLAR FOR A PERIOD OF 24 HOURS TO INSURE THAT THE SUMPS ARE WATERTIGHT. RECORD THE TEST RESULTS AND SUBMIT TO OWNER. U)
<br /> TURBINE LIQUID SUMP SENSORS X X 11. TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS FORWARDED AND APPROVED BY GOVERNING AGENCY PRIOR TO TANK SYSTEM BEING
<br /> FILL LIQUID SUMP SENSORS X PLACED IN OPERATION. 0
<br /> BRINE SUMP ANNULAR SENSORS X 12. PRIOR TO FUEL BEING PUMPED, STATION MUST HAVE VEEDER ROOT FUNCTIONAL AND MONITORING ANNULAR SPACES OF TANK AND DISPENSER SUMPS. V0 0 Z
<br /> BRINE TANK ANNULAR SENSORS X - 13. PAYMENT OF ALL APPLICABLE UST OPERATING FEES SHALL BE SUBMITTED TO THE GOVERNING JURISDICTION WITHIN 30 DAYS OF THE FINAL �
<br /> VACUUM SENSORS X X INSPECTION.
<br /> PLLD LINE LEAK DETECTORS X X - � �� 14. EVIDENCE OF FINANCIAL RESPONSIBILITY SHALL BE SUBMITTED TO GOVERNING AGENCY L Q ^
<br /> ISD SENSORS X - - - - - - 15. N/A.
<br /> IIJLJI � w „��(
<br /> 16. ANY INDIVIDUAL(S) INSTALLING UNDERGROUND STORAGE TANK SYSTEM COMPONENTS SHALL MEET THE FOLLOWING REQUIREMENTS. OR WORK UNDER THE DIRECT AND z (/� V6
<br /> PERSONAL SUPERVISION OF AN INDIVIDUAL PHYSICALLY PRESENT AT THE WORK SITE WHO MEETS THE FOLLOWING: Q
<br /> 1. THE INDIVIDUAL HAS BEEN ADEQUATELY TRAINED AS EVIDENCED BY A CURRENT CERTIFICATE OF TRAINING ISSUED BY THE O
<br /> MANUFACTURE(S) OF THE UST SYSTEM COMPONENTS.
<br /> 1. SAN JOAOUIN COUNTY COUNTY ENVIRONMENTAL RESOURCES CONDITIONS: 2. THE INDIVIDUAL SHALL POSSESS A CURRENT UST SYSTEM INSTALLER CERTIFICATE FROM THE INTERNATIONAL CODE COUNCIL �j z
<br /> (ICC), INDICATING THAT THE INDIVIDUAL HAS PASSED THE ICC UST INSTALLATION/RETROFITTING EXAM. ISI Q Q
<br /> 2. INSTALLATION AND TESTING MUST MEET ALL OF THE REQUIREMENTS OF CCR SECTION 2635.
<br /> 3. THE INDIVIDUAL SHALL HAVE A VALID AND CURRENT CONTRACTOR'S LICENSE ISSUED TO THE INSTALLATION COMPANY, NOT � �
<br /> UNDER NO CONDITIONS SHALL ANY EQUIPMENT SUBSTITUTIONS TAKE PLACE WITHOUT A WRITTEN REQUEST TO THIS DEPARTMENT AND NECESSARILY THE INDIVIDUAL ON-SITE. z
<br /> 3' WRITTEN APPROVAL GRANTED.
<br /> 17. SERVICE TECHNICIANS SHALL POSSESS OR WORK UNDER THE DIRECT AND PERSONNEL SUPERVISION OF AN INDIVIDUAL PHYSICALLY PRESENT AT THE WORK SITE (=) �
<br /> AFTER INSTALLATION, BUT BEFORE BEING PLACED IN OPERATION, THE TANKS SHALL RECEIVE AN ENHANCE LEAK DETECTOR TEST. A WHO POSSESSES A CURRENT CERTIFICATE FROM THE INTERNATIONAL CODE COUNCIL (ICC), INDICATING HE OR SHE HAS PASSED THE CALIFORNIA UST SERVICE 00 C)
<br /> CALIFORNIA LICENSE TANK TESTER FOR THE SPECIFIC METHOD UTILIZED MUST PERFORM THE TEST. THE TEST RESULTS MUST BE SENT TECHNICIAN EXAM.
<br /> 4' DIRECTLY TO THIS OFFICE FROM THE TESTING COMPANY PRIOR TO FACILITY OPERATION.
<br /> A "UST CERTIFICATION OF INSTALLATION/MODIFICATION" FORM SHALL BE SUBMITTED TO THE CALIFORNIA ENVIRONMENTAL REPORTING consultant job#
<br /> 5• SYSTEM FOR THE FACILITY PRIOR TO FACILITY OPERATION. 18. UST SYSTEMS INSTALLED AFTER JULY 1, 2004 REQUIRES ENHANCED LEAK DETECTION (ELD) TESTING BY A SWRCB APPROVED VENDOR. AT THIS TIME
<br /> THE SWRCB RECOGNIZED PRAXAIR SERVICES, INC., CRGS, INC. AND IOTA. *SEE HEALTH & SAFETY CODE, SECTION 25290.1(J). CONTRACTOR WILL
<br /> FIBER LINES SHALL BE INSTALLED BETWEEN THE TANK AND EXCAVATION TO PREVENT INFILTRATION OF NATIVE SOIL INTO PROVIDE APPROVED WORKPLAN TO SAN JOAQUIN COUNTY COMMUNITY HEALTH AGENCY, DEPARTMENT OF ENVIRONMENTAL HEALTH, HAZARDOUS master release date
<br /> BACKFILL MATERIAL. MATERIALS MANAGEMENT DIVISION
<br /> 19. THE CONTRACTOR SHALL PROVIDE A STATE FORM C AT THE CONCLUSION OF THE CONSTRUCTION AND AVAILABLE BY THE FINAL FIELD INSPECTION. project master
<br /> exe date drawn by
<br /> 20. THE OWNER SHALL PROVIDE THE STATE FORM A AND (3) STATE FORMS BS WITH THE RE-SUBMITTAL
<br /> 21. "FIRE DEPARTMENT SHALL BE NOTIFIED OF THE ENVIRONMENTAL HEALTH INSPECTION DATE AND TIME 1 WEEK IN ADVANCE OF INSPECTION"
<br /> 22. EVERY GASOLINE VAPOR RECOVERY SYSTEM OR COMPONENT WHICH IS CERTIFIED BY THE STATE FIRE MARSHAL SHALL BEAR A LABEL CONFORMING TO THE Facility/Project
<br /> PROVISIONS OF THIS SECTION. LABELS SHALL BE PLACED IN A CONSPICUOUS LOCATION AND SHALL BE ATTACHED BY THE MANUFACTURER DURING PRODUCTION
<br /> CallTollFree UNDERGROUND TANK AND PIPING SITE PLAN ° 20' 40' OR FABRICATION. IN ACCORDANCE WITH SECTION 1918.22
<br /> 23. PIPING SYSTEMS SHALL BE PNEUMATICALLY TESTED TO 110 % OF OPERATING PRESSURE OF 40 PSI, WHICH EVER IS GREATER, IN ACCORDANCE WITH
<br /> 1 (800) 227-2600 MANUFACTURER INSTALLATION INSTRUCTIONS.
<br /> TWO sheet name
<br /> WORKING DAYS 24. EQUIPMENT SHALL BE LOCATED NOT LESS THAN 50' FROM ANY FUEL TRANSFER AREA AND NOT LESS THAT 10' FROM BUILDINGS OR BUILDABLE PROPERTY LINES. G02 .0
<br /> O^ .O
<br /> BEFORE YOU IN ACCORDANCE WITH SECTION 1918.64. FENCES AND/OR BOLLARDS SHALL BE PROVIDED TO PROTECT VAPOR PROCESSING AGAINST TAMPERING, TRESPASSING, (v' L
<br /> DIG AND VEHICULAR TRAFFIC. THE AREA MUST BE KEPT CLEAR OF ANY COMBUSTIBLE FOR AT LEAST 10'. IN ACCORDANCE WITH SECTION 1918.65