Laserfiche WebLink
TANK AND PIPING INSTALLATION SCOPE OF WORK : AGCOC.COM <br /> z - <br /> PIPING SUMP PENETRATION INSTALLATION: MANHOLE CROWNS: CONTRACTOR PERFORMANCE: ~ <br /> a <br /> STANDARD: CONTRACTOR TO INSTALL SUMP PENETRATION FITTINGS. ALL PENETRATIONS OF THE SUMPS TO BE ON A LINE TOWARD THE CENTER OF ALL MANHOLE OPENINGS ON THE TANK SLAB SHALL BE INSTALLED WITH A 1-1/2" CROWN (1 " RISE OVER 12" RUN) OF THE CONTRACTOR WILL GUARANTEE ALL MATERIALS AND WORKMANSHIP FURNISHED BY HIM UNDER THIS CONTRACTOR FOR A PERIOD OF TWO LV <br /> THE SUMP, NOT TO EXCEED MANUFACTURERS RECOMMENDED ANGLE IN ANY DIRECTION, TO ENSURE THE PROPER INSTALLATION OF ALL BULKHEAD CONCRETE TO PREVENT WATER INTRUSION INTO THE MANHOLE. THE OWNER'S ENGINEER, THE PROJECT MANAGER WILL BE YEARS FROM THE DATE OF FINAL ACCEPTANCE OF THE WORK OF THIS CONTRACT BY THE OWNER AND THE ENGINEER AND PROVIDE A BOND TO Z <br /> AND COMPRESSION FITTINGS AND RESULTANT WATER TIGHTNESS. ALL PIPING, CONDUIT AND GROUNDS THAT PENETRATE THE SUMP SIDE WALLS MUST REQUIRED TO SIGN OFF ON THIS ITEM ON THE TANK INSTALLATION CHECKLIST. VALIDATE THIS GUARANTEE. ANY DEFECTS DEVELOPING WITHIN THE PERIOD TRACEABLE TO MATERIALS OR WORKMANSHIP PERFORMED HERE UNDER, <br /> BE SEALED WITH DOUBLE SIDED BULKHEAD FITTINGS IN SUMPS. SUMPS SHALL BE HYDROSTATICALLY TESTED WITH STANDING WATER FOR A PERIOD WILL BE MADE GOOD AT THE EXPENSE OF THE CONTRACTOR NOT THE OWNER OR ENGINEER. THE CONTRACTOR WILL ACCEPT AND FULLY O <br /> PRODUCT IDENTIFICATION MARKINGS: UNDERSTAND THIS PROVISION PRIOR TO CONTRACT BEING AWARDED, AS NO CLAIM FOR EXTRA COMPENSATION WILL BE ALLOWED FOR CORRECTION U <br /> OF 24 HOURS OR CERTIFIED USING SUMP MANUFACTURERS APPROVED TESTING PROCEDURE TO INSURE THAT SUMPS ARE WATERTIGHT. THE OWNER'S CONTRACTOR TO INSTALL PRODUCT IDENTIFICATION TAGS AT ALL MANHOLE OPENING PER SITE SPECIFIC DETAIL DRAWINGS. OF FAULTY WORK OR DEFECTIVE MATERIALS. ANYTIME DURING THE CONSTRUCTION PERIOD, THE OWNERS REPRESENTATIVES RETAIN THE RIGHT TO <br /> ENGINEER, THE PROJECT MANAGER MUST SIGN OFF ON THIS TESTING ON THE TANK INSTALLATION CHECK LIST. REQUIRE THE CONTRACTOR TO REMOVE AND REINSTALL ANY EQUIPMENT OR MATERIALS NOT FOLLOWING THE STANDARDS AS PRESENTED HEREIN Z <br /> MANUFACTURER ENTRY BOOT TYPE VARIANT: THE MAKE AND MODEL NUMBERS OF THE PIPING PENETRATION FITTINGS SHOWN IN THE DETAILS ARE OR ON THE DRAWINGS WITHOUT COST TO THE OWNER. Fn <br /> NOT SUBJECT TO CHANGE. SMITH FIBERCAST FRP BONDED ENTRY FITTINGS ARE REQUIRED FOR ALL PIPING PENETRATIONS. CONDUIT PENETRATIONSLLJ <br /> a) <br /> INTO SUMPS SHALL BE AS SPECIFIED ON THE PLANS. CONTRACTOR WILL PROVIDE PROOF OF PERFORMANCE BOND WITH SHOP DRAWINGS M LO <br /> PROVIDE 3 SETS OF SHOP DRAWINGS & SAMPLES FOR ALL EQUIPMENT, PRIOR TO ORDERING AND IN A TIMELY MANNER (AS DETERMINED BY THE <br /> ENGINEER SO NOT TO DELAY WORK, TO THE ENGINEER FOR APPROVAL. CONDUIT, SWITCHES, CONDUCTORS, ECT. WHERE SUBSTITUTIONS ARE v <br /> CONTRACTOR TO INSTALL SUMP PENETRATION FITTINGS THAT MEET THE ADDITIONAL CRITERIA REQUIREMENT FOR CONTINUOUS HYDROSTATIC AND ) ( ) <br /> VACUUM MONITORING. MADE. CONTRACTOR WILL INCLUDE COMPARISON DATA & SAMPLES FOR BOTH THE SUBSTITUTE AND SPECIFIED ITEMS FOR REFERENCE PURPOSES. co <br /> P <br /> TESTING: Q ° <br /> o <br /> DISPENSER INSTALLATION: CONTRACTOR SHALL COMPLETE ALL TESTING ACCORDING TO MANUFACTURER'S INSTRUCTIONS FOR TANKS AND PIPING AND PER INDUSTRY CONTRACTOR WILL PROVIDE LETTER TO ENGINEER CONFIRMING ALL EQUIPMENT AND TERMINATIONS ARE PROPERLY TORQUED — SIGNED BY � M <br /> RECOMMENDED PRACTICES (API & PEI). CONTRACTOR SHALL COMPLETE ALL WARRANTY VALIDATION TESTING AND PROVIDE DOCUMENTATION TO LICENSED CONTRACTOR. N U) > a- <br /> STANDARD: CONTRACTOR TO INSTALL DISPENSERS WITH INTEGRATED CARD READERS AND INTERCOM SYSTEM AS SHOWN ON SITE SPECIFIC DESIGN OWNER'S REPRESENTATIVE OR HIS AGENT, THE PROJECT MANAGER. CONTRACTOR WILL PROVIDE ACCURATE AND COMPLETE "AS BUILT" DRAWINGS TO OWNER OR OWNER REPRESENTATIVE AT TIME OF OWNER <br /> DETAIL SHEETS. DISPENSERS TO BE INSTALLED PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. INSTALLATION TO INCLUDE DISPENSER ISLANDS, ACCEPTANCE. ALL "AS BUILT" DRAWINGS TO BE 4 SETS OF PRINTS 24" X 36". FAILURE TO DO SO WILL CONSTITUTE FORFEITURE OF ALL <br /> DOUBLE WALL DISPENSER CONTAINMENT SUMPS, AND THE INSTALLATION OF ALL SHEAR VALVES, RISERS, PIPING CONNECTIONS AND ALL PIPE TESTING: PAYMENTS DUE. <br /> PENETRATIONS INTO THE SUMPS. ISOLATE THE PRODUCT TANKS AND DISPENSERS DURING PRESSURE TESTING OF LINES IN ORDER TO PREVENT DAMAGE. m <br /> THE DESIGN, ASSEMBLY, AND TESTING OF THE PIPING SYSTEM SHALL BE IN CONFORMANCE WITH THE APPLICABLE SECTION <br /> DISPENSER START UP: — START UP BY MANUFACTURERS REPRESENTATIVE. CONTRACTOR TO PURGE LINES WITH 200 GALLONS PER HOSE MINIMUM. OF ANSI-1331, AMERICAN NATIONAL STANDARD CODE FOR PRESSURE PIPING, NEPA 30, FLAMMABLE AND COMBUSTIBLE <br /> ANY AIR POCKETS OR START UP PROBLEMS DUE TO IMPROPER INSTALLATION OR INCORRECT WIRING THAT DESTROYS ELECTRONICS WILL BE BILLED LIQUIDS CODE, AND AMERICAN PETROLEUM INSTITUTES RECOMMENDED PRACTICE 1615. <br /> BACK TO THE CONTRACTOR DURING CONSTRUCTION, BEFORE BACK FILLING, PIPING SHOULD BE ISOLATED FROM THE TANKS AND SUBJECTED TO A PIPE TIGHTNESS TEST. <br /> OTHER TESTING METHODS MAY ALSO BE ACCEPTABLE IF APPROVED BY THE AUTHORITY HAVING JURISDICTION. A CONSTRUCTION PIPE TEST IS <br /> CONDUCTED AS FOLLOWS: <br /> INSTALLATION OF HANGING HARDWARE: <br /> A. THE PRODUCT PIPING TO BE TESTED IS ISOLATED AND PRESSURIZED WITH COMPRESSED AIR TO 150 PERCENT OF THE MAXIMUM SYSTEM <br /> CONTRACTOR TO INSTALL ORVR/PHASE II EVR COMPATIBLE HOSES, NOZZLES, SWIVELS AND BREAK AWAY VALVES PER APPLICABLE CARB EXECUTIVE OPERATING PRESSURE (OR A MINIMUM OF 50 POUNDS PER SQUARE INCH GAUGE; MAXIMUM AS RECOMMENDED BY COMPONENT MANUFACTURER) <br /> ORDER WITH IN SYSTEM DIAGNOSTICS (ISD) PER LOCAL JURISDICTIONAL REQUIREMENTS. FOR AT LEAST 30 MINUTES AND NOT MORE THAN 1 HOUR. <br /> B. ALL PIPING SURFACES INCLUDING VALVES, FITTINGS, JOINTS, AND SO FORTH ARE WETTED WITH A SOAP SOLUTION AND INSPECTED FOR <br /> SUMP SENSOR INSTALLATION: BUBBLES. <br /> CONTRACTOR TO INSTALL ALL FILL SUMP, TURBINE SUMP AND DISPENSER SUMP SENSORS PER VEEDER ROOT INSTALLATION INSTRUCTIONS. SUMP C. LEAKS, AS INDICATED BY BUBBLES, ARE REPAIRED OR REPLACED, AND THE PIPING RE—TESTED AS NECESSARY. <br /> SENSORS TO BE INSTALLED IN SUMP HOLDERS MOUNTED TO SIDE OF SUMP WALLS SEE TANK DETAIL SHEETS FOR LIQUID SENSOR DETAILS. D. THE INNER PIPE WALLS SHALL BE TESTED FOR TIGHTNESS BEFORE CLOSING THE OUTER PIPE. THE OUTER PIPE MUST BE TESTED AT A 5 N <br /> TURBINE SIDE SUMP SENSORS TO BE MOUNTED AT SIDE OF TANK WHERE PRODUCT PENETRATION INTO SUMP IS MADE AND BELOW LOWEST POUNDS PER SQUARE INCH GAUGE MAXIMUM BEFORE BACKFILLING. CARE SHOULD BE TAKEN TO PREVENT OVER PRESSURIZATION OF THE o <br /> PENETRATION FITTING WITHIN SUMP AREA AT BOTTOM OF SUMP. SEE TANK ELECTRICAL DRAWINGS FOR MONITORING CONDUIT DETAILS AND SENSOR INTERSTICE. IT IS IMPORTANT THAT THE MANUFACTURER'S INSTRUCTIONS BE FOLLOWED. REPEAT BOTH TESTS AFTER BACKFILLING. N <br /> AND PROBE WIRING DETAILS. WHEN THE PIPING IS INSTALLED AND OPERATIONAL, A HYDROSTATIC TEST OF THE PIPING, AS SPECIFIED IN NFPA 329, MAY BE REQUIRED BY <br /> CODES. <br /> OVERFILL ALARM AND ACKNOWLEDGE SWITCH INSTALLATION: <br /> CONTRACTOR TO INSTALL OVERFILL ALARM & ACKNOWLEDGMENT AS SHOWN. ALARM AND SWITCH TO BE LOCATED TO PROVIDE AN CAUTION: EXTREME CARE SHOULD BE EXERCISED IN CONDUCTING PIPE TIGHTNESS TEST. PRESSURIZED PIPING IS POTENTIALLY DANGEROUS <br /> UNOBSTRUCTED VIEW TO TRUCK DRIVER. PROVIDE BOLLARD PROTECTION OF FREE STANDING POLE. SEE SITE SPECIFIC WIRING DIAGRAM BECAUSE OF THE POSSIBILITY OF VIOLENT RUPTURE. THIS TEST SHOULD BE CONDUCTED WITH MINIMUM EXPOSURE OF PERSONNEL AND WITHOUT <br /> AND DETAILS FOR MOUNTING REQUIREMENTS. MOVING OR DISTURBING THE PIPING BEING TESTED. WHEN THE TEST IS COMPLETED, THE PIPING PRESSURE CAN BE REDUCED OR RELEASED <br /> COMPLETELY FOR THE REMAINDER OF CONSTRUCTION. REFER TO THE PIPING MANUFACTURER'S RECOMMENDATIONS. <br /> SMITH FIBERCAST PIPING SHALL BE TESTED ACCORDING TO MANUFACTURER'S SPECIFICATIONS. <br /> VEEDER ROOT TLS-350 PLUS CONSOLE INSTALLATION: VAPOR RECOVER PIPING MUST PASS ALL CARB BLOCKAGE TESTING RELATIVE TO TIGHTNESS, PRESSURE DECAY, & BLOCKAGE RATES. A/L TESTING <br /> CONTRACTOR TO INSTALL "VEEDER ROOT" TANK AND LINE ALARM CONTROL PANEL MODEL #TLS-350 PLUS IN BUILDING. INSTALL IS REQUIRED FOR "ASSISTED" STAGE II SYSTEMS (IF INSTALLED). NOTIFY THE PROJECT MANAGER TO COORDINATE. <br /> PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. SEE DRAWINGS FOR EXACT LOCATION IN BUILDING. CONTAINMENT SUMP TESTING: <br /> ALL TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE HYDROSTATICALLY TESTED (LAKE TEST) WITH STANDING WATER a <br /> ABOVE THE LEVEL OF THE HIGHEST PIPE OR CONDUIT PENETRATION FOR A PERIOD OF 24 HOURS AFTER ALL WORK IS COMPLETED TO <br /> INSURE THAT THE SUMPS ARE WATERTIGHT OR CERTIFIED USING SUMP MANUFACTURER'S APPROVED TEST PROCEDURE TO INSURE THAT <br /> SUMPS ARE WATERTIGHT PER UST REGULATIONS. THE OWNER'S ENGINEER MUST SIGN OFF ON THIS TESTING ON THE TANK INSTALLATION o <br /> CHECKLIST. Z <br /> CONCRETE TANK SLAB INSTALLATION: ALL DOUBLE WALL SUMPS SHALL BE BRINE FILLED AND INSPECTED FOR TIGHTNESS THROUGHOUT THE INSTALLATION PROCESS ONCE SUMPS <br /> HAVE BEEN FILLED WITH BRINE SOLUTION. <br /> STANDARD: CONTRACTOR TO INSTALL A MINIMUM 8" REINFORCED CONCRETE SLAB OVER TANKS. FIBER REINFORCEMENT TO BE <br /> USED. PREMIX UNIFORMLY THROUGHOUT CONCRETE. REINFORCEMENT BARS TO BE NO LESS THAN 2" AND NO MORE THAN 4" FINAL SYSTEM TESTING: <br /> FROM SURFACE REINFORCE CONCRETE SLAB AROUND MANHOLES WITH (4) #4 REBAR, 60" IN LENGTH. PLACE REBAR 6" FROM AFTER COMPLETE INSTALLATION OF THE ENTIRE FUEL SYSTEM AND ALL PAVING, THE OWNER'S REPRESENTATIVE OR HIS AGENT, THE PROJECT <br /> SIDES OF BOX. MANAGER, SHALL ARRANGE FOR A PRECISION TANK AND LINE TEST TO BE PERFORMED ON THE COMPLETE SYSTEM. SUCCESSFUL COMPLETION OF <br /> THIS TEST WILL BE REQUIRED FOR FINAL APPROVAL. THIS TEST SHALL ENSURE THAT ALL NEW TANK & PIPING SHALL MEET ALL FEDERAL, STATE, <br /> UNLESS OTHERWISE NOTED ON THESE DRAWINGS: & LOCAL REQUIREMENTS FOR TIGHTNESS INTEGRITY, PRIOR TO START—UP OF SYSTEM. OPERATIONALLY TEST ALL OTHER EQUIPMENT, INCLUDING <br /> a. CONCRETE — REGULAR WEIGHT HARD ROCK CONCRETE (150 LBS/CU FT) IMPACT (SHEAR) VALVES, LINK LEAK DETECTORS, LEAK DETECTOR ALARMS, AND EMERGENCY SHUTDOWN SWITCHES IN ACCORDANCE WITH THE <br /> b. CEMENT — TYPE 1/11, SULFATE RESISTANT MANUFACTURER'S INSTRUCTIONS. CONTRACTOR SHALL PROVIDE (3) COPIES OF ALL CERTIFICATIONS & TEST RESULTS TO OWNER'S REPRESENTATIVE <br /> c. AGGREGATES — ASTM C33, (MAXIMUM SIZE 3/4 INCHES) OR HIS AGENT, THE PROJECT MANAGER. <br /> d. 28 DAY CONCRETE STRENGTH (f'c): TANK SYSTEM TEST METHOD AB-2481 : <br /> 4,000 PSI — SLAB (DESIGN BASED ON 2,000 PSI NO SPECIAL INSPECTION REQUIRED) BEFORE THE UNDERGROUND STORAGE TANK IS PLACED INTO USE, THE UNDERGROUND STORAGE TANK SHALL BE TESTED AFTER <br /> e. SLUMP — 3"+ 1" — 4" MAXIMUM AT POINT OF PLACEMENT INSTALLATION USING ONE OF THE FOLLOWING METHODS TO DEMONSTRATE THAT THE TANK IS PRODUCT TIGHT: <br /> f. SHRINKAGE — 0.05% MAXIMUM 1) ENHANCED LEAK DETECTION (ELD) BY TRACER CORPORATION. IL�_JI <br /> g. ENTRAINED AIR RANGE — 2% TO 4% 2) AN INERT GAS PRESSURE TEST THAT HAS BEEN CERTIFIED BY A THIRD PARTY. <br /> CONCRETE SLAB THICKNESS SHALL BE A MINIMUM OF 7.0 INCHES (UNLESS OTHERWISE NOTED ON THESE DRAWINGS) 3) A TEST METHOD DEEMED EQUIVALENT TO ENHANCED LEAK DETECTION OR AN INERT GAS PRESSURE TEST BY THE BOARD IN <br /> REGULATIONS ADOPTED PURSUANT TO THE APPLICABLE CHAPTER IN THE CODE. O <br /> CONCRETE SHALL BE NORMAL WEIGHT WITH A MIX OF 1 2 1/2 3 1/2, WITH A MAXIMUM 7 1/2 GALLONS OF WATER PER SACK. <br /> ADD 1.0 TO 1.5 LB STEALTH FIBER REINFORCING PER CU. YD. CONCRETE. p <br /> REINFORCING STEEL FOR TANK SUMP CAGES SHALL BE #4 REBAR. <br /> MAINTAIN CONCRETE IN A MOIST CONDITION FOR AT LEAST 7 DAYS AFTER PLACEMENT. TANK ELECTRICAL SPECIFICATIONS: LL <br /> PLACE CONCRETE DIRECTLY FROM TRUCK INTO FORMS. DO NOT PUMP CONCRETE UNLESS SPECIAL INSPECTION, IN ACCORDANCE WITH GENERAL: O <br /> CHAPTER 3 OF THE IBC, IS PROVIDED. ALL MATERIALS AND WORKMANSHIP WILL CONFORM TO THE MOST RECENT EDITIONS OF THE NATIONAL ELECTRICAL CODE, N.E.T.A., B.I.C.S.I., <br /> SUBMIT MIX DESIGNS, WITH STRENGTH AND SHRINKAGE TEST RESULTS, TO OWNER'S ENGINEER AT LEAST 7 DAYS BEFORE PLACING CONCRETE. U.B.C. & NFPA AS REQUIRED BY THE LOCAL AND STATE CODES AND ORDINANCES, AMERICANS WITH DISABILITIES ACT, E.P.A., AND UTILITY W <br /> CONSOLIDATE CONCRETE IN PLACE USING A MECHANICAL VIBRATOR. COMPANY REQUIREMENTS. 11 <br /> THE CONTRACTOR WILL VISIT THE JOB SITE AND FAMILIARIZE HIMSELF WITH ALL EXISTING CONDITIONS WHICH MAY AFFECT HIS BID OR <br /> BEFORE PLACING CONCRETE, SECURE REINFORCING STEEL, ANCHOR BOLTS, DOWELS, AND OTHER INSERTS IN POSITION TO PREVENT WORK. NO ALLOWANCES WILL BE MADE AFTER THE BID FOR EXISTING CONDITIONS OR THE CONTRACTORS FAILURE TO VERIFY EXISTING O <br /> MOVEMENT. CONDITIONS. <br /> MATERIALS AND WORKMANSHIP SHALL CONFORM TO A.C.I. — 318 (SPECIFICATIONS OF THE DESIGN AND PLACEMENT OF CONCRETE). FURNISH AND INSTALL A COMPLETE ELECTRICAL SYSTEM AS DEPICTED FROM THE PLANS AND SPECIFICATIONS HEREIN — AS NOTED OR � )U�^ <br /> IMPLIED — NOT LIMITED TO WHAT IS SHOWN. v <br /> ALL DRAWINGS ARE SCHEMATIC IN NATURE AND ALL APPURTENANCES NOT INDICATED TO MAKE A WORKING SYSTEM MUST BE INCLUDED n <br /> IN CONTRACTOR'S BID. `J <br /> IF THERE APPEARS TO BE ANY ITEMS IN CONFLICT WITH THE DRAWINGS, INCONSISTENCIES WITH DESIGN OR INTENT, OR NEED FOR z <br /> CLARIFICATION, IT IS THE CONTRACTOR'S RESPONSIBILITY TO CLARIFY THESE ITEMS PRIOR TO BID IN WRITING. IF THE CONTRACTOR FAILS fr ^^ <br /> TO CLARIFY ANY QUESTIONS OR INCONSISTENCY, THEY ACCEPT RESPONSIBILITY TO CORRECT AT THEIR COST ANY SUCH ITEM SO AS TO 1..� <br /> MEET INTENT AS DEFINED. w <br /> UTI LITI ES: ® z U <br /> CONTRACTOR WILL SUPPLY INFORMATION AS REQUIRED TO ALL SERVING UTILITIES IN A TIMELY MANNER TO PROVIDE SERVICE REQUIRED. LLJ I_.— L.Lj 0 <br /> QO z <br /> RSG FITTINGS & CONDUIT: O Q <br /> RGS FITTINGS MUST BE STEEL COMPRESSION TYPE; EACH WITH CODE SIZED COPPER BOND WIRE. MINIMUM CONDUIT 1" C. EXCEPT AS _ <br /> NOTED. ALL WORK WILL BE IN CONDUIT; COMPLETED SYSTEM REAMED, AND SWABBED PRIOR TO CONDUCTOR INSTALL. <br /> 7 <br /> ALL CONDUITS TO BE CONCEALED EXCEPT TO SURFACE MOUNTED PANELS TIE WIRE, PERFORATED STRAPS, OR OTHER PIPING OR Ln Z 7 <br /> CONDUIT ARE NOT ACCEPTABLE SUPPORTS. NO TIE WIRE WILL BE ALLOWED ON PROJECT. 0--) = Q <br /> THE LAST 2 FEET (MINIMUM) OF ALL CONDUITS THAT ARE ROUTED TO AND PENETRATE TANK SUMPS, DISPENSER SUMPS AND VENT 00 C) <br /> TRANSITION SUMPS SHALL BE PVC COATED RIGID STEEL GALVANIZED WHERE PENETRATIONS TO THE BRINE FILLED SUMPS ARE MADE. <br /> ROBROY CONDUIT MUST BE USED WITH THE BRAVO PENETRATION FITTING — NO SUBSTITUTE PERMITTED. consultant job# <br /> CONDUCTORS: <br /> master release date <br /> CONDUCTORS TO BE 600V., COPPER (98% CONDUCTIVITY). BRANCH CIRCUITS TO HAVE THHN/THWN GAS & OIL RESISTANT INSULATION. <br /> CONDUCTORS WILL BE STRANDED, HYDRAULIC CRIMP ALL CONNECTIONS. CONDUCTOR INSULATION WILL BE CONTINUOUSLY COLOR COATED. project master <br /> ALL GROUNDING/BUILDING CONDUCTORS WILL BE MULTI—CONDUCTOR TYPE (U.L. LABELED — ROPE STRAND BUILDING WIRE CLASS 'M') exe date drawn by <br /> BARE OR INSULATED AS NOTED OR REQUIRED. <br /> MINIMUM LINE VOLTAGE WIRE SIZE IS #12 AWG (STRANDED) FOR LINE VOLTAGE WIRING DEVICES TO BE SPECIFICATION GRADE, <br /> MINIMUM 20 AMPS FOR RECEPTACLES. HUBBELL OR ENGINEER APPROVED. ALL SPECIAL RECEPTACLES AND GROUND FAULT <br /> PROTECTED DEVICES MUST BE PERMANENTLY MARKED WITH ENGRAVED COVER PLATES. Facility/Project <br /> FILL RISER GROUNDING: <br /> ALL RISERS IN THE FILL SUMP SHALL BE GROUNDED AND BONDED. <br /> INSTALL 1/2" x 10'-0" LONG CONTINUOUS COPPER CLAD GROUND ROD IN NATIVE SOIL FOR TANK SYSTEM GROUNDING. PROVIDE sheet name <br /> MANHOLE ACCESS TO GROUND ROD AND COPPER GROUND WIRE. G02 .2 <br />