My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
26
>
1900 - Hazardous Materials Program
>
PR0520794
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2023 2:22:25 PM
Creation date
10/4/2023 10:00:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0520794
PE
1920
FACILITY_ID
FA0011268
FACILITY_NAME
TRANSMISSIONS BY HAL
STREET_NUMBER
26
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04321027
CURRENT_STATUS
01
SITE_LOCATION
26 N CHEROKEE LN #A
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN '�d DAQ II II Environmental Health Department <br /> C0uNT <br /> Hazardous Materials Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> TRANSMISSIONS BY HAL 26 N CHEROKEE LN, LODI September 21, 2023 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 12 HSC 25505(c) Failed to have the HMBP readily available to facility or EHD personnel. <br /> OBSERVATION: Employees do not have access to the Emergency Response Plan and the inventory information <br /> on-site. <br /> REGULATION GUIDANCE: The emergency response plans and procedures,the inventory of information required <br /> by this article, and the site map required by this section shall be readily available to personnel of the business or <br /> the unified program facility with responsibilities for emergency response or training pursuant to this section. <br /> CORRECTIVE ACTION: Immediately make arrangements to have the business plan readily available for review. <br /> This is a Class II violation. <br /> Overall Inspection Comments: <br /> Conducted a Hazardous Materials Business Plan (HMBP) inspection. There were six violations during the <br /> inspection. Complete and submit a copy of the Return to Compliance Certification form to the EHD with a <br /> statement documenting the corrective actions that have been or will be taken for each violation, and any <br /> supporting paperwork, by 10/21/23. <br /> To minimize person to person contact EHD is choosing to write the name of person receiving the report instead <br /> of having them sign. Starting September 1, 2018, all in-office CERS help will be provided at EHD hourly rate <br /> ($162). To schedule an appointment, please call (209)468-3420. <br /> AFTER THE COMPLIANCE DATE, EHD WILL BILL FOR ALL TIME AND ACTIVITIES ASSOCIATED WITH BRINGING <br /> THIS FACILITY BACK INTO COMPLIANCE. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> Received by: Date: September 21, 2023 Inspector: Inspector Phone: <br /> Printed Name and Title: HAZA SAEED, Lead Senior REHS (209)953-6212 <br /> Emailed to Ron Ostorero, Owner <br /> FA0011268 PR0520794 SCO01 09/21/2023 <br /> EHD 19-01 Rev.12/06/2021 Page 4 of 4 Hazardous Materials Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.