My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2023-2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
CORRESPONDENCE_2023-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2024 2:15:18 PM
Creation date
10/6/2023 9:14:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2023-2024
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Part 3. FACILITY INFORMATION <br /> A. FACILITY INFORMATION : <br /> 1 . INFORMATION APPLICABLE TO ALL EXISTING FACILITIES. 2, PROPOSED CHANGE(S) OR INFORMATION APPLICABLE TO NEW SWFP <br /> AND/OR WDRs <br /> a , MAXIMUM DAILY TONNAGE a. MAXIMUM DAILY TONNAGE <br /> OR CUBIC YARDS 7 ,800 tonsiday (TPD) OR CUBIC YARDS n/a <br /> b. AS-DESIGNED DAILY TONNAGE 1 ,800 TPD b, AS-DESIGNED DAILY TONNAGE n/a <br /> or CUBIC YARDS or CUBIC YARDS <br /> c. FACILITY SIZE (acres) 51 ,7 acres c. FACILITY SIZE (acres) n1a <br /> d. MAXIMUM TRAFFIC VOLUME PER DAY 1 ,245 vehicles per day d. MAXIMUM TRAFFIC VOLUME PER DAY n/a <br /> (vpd) (vpd) <br /> e. DAYS AND HOURS OF OPERATION Receipt of Materlak Commercial, e. DAYS AND HOURS OF OPERATION n1a <br /> 4 AM to 6 PM/Monday on Sunday; Self-haul, 6 AM to 6 PM/Monclavosunday <br /> Processing hours: Indoors - 24 h0tlrslMOnday-5tind8y, outdoors - b AM <br /> 0 10 PNIlMondaymBunday, Maintenance ours : 24 hoursiMondaynSunday <br /> ppPpPoppow <br /> I. OTHER n/a <br /> 3. ADDITIONAL INFO, REQUIRED FOR COMPOSTABLE MATERIALS HANDLING FACILITIES ONLY: <br /> a. TOTAL SITE CAPACITY (cu yds) 68,700 cubic yards <br /> 4. ADDITIONAL INFORMATION REQUIRED FOR LANDFILLS ONLY: <br /> a . AVERAGE DAILY TONNAGE (TPD) n1a <br /> b. SITE CAPACITY CURRENTLY PERMITTED (Airspace) (cu yds) n/a <br /> c, SITE CAPACITY PROPOSED (Airspace) (cu yds) nia <br /> d . SITE CAPACITY USED TO DATE (Airspace) (cu yds) n1a <br /> e. SITE CAPACITY REMAINING (Airspace) (cu yds) n/a <br /> I, DATE OF CAPACITY INFORMATION (Dale) (See instructions): n1a <br /> g. LAST PHYSICAL SITE SURVEY (Date) n1a <br /> h. ESTIMATED CLOSURE DATE (month and year) n1a <br /> i. DISPOSAL FOOTPRINT (acres) n1a <br /> i. SITE CAPACITY PLANNED (cu yds) n/a <br /> k, 1 . (i) IN-PLACE WASTE DENSITY (Ibs of waste per cu yd of waste) nia <br /> AND <br /> (ii) WASTE-TO-COVER RATIO (Estimated) (v: v) n/a <br /> OR <br /> 2. AIRSPACE UTILIZATION FACTOR (tons of waste per cu yd of landfill airspace) n/a <br /> Part 4. SOURCE OF WATER SUPPLY (Check applicable boxes) <br /> ElA. MUNICIPAL OR UTILITY SERVICE n/a <br /> 0 B. INDIVIDUAL (wens) : All water for facility operations, Including potable water will be obtained from an on site supply well <br /> C. SURFACE SUPPLY: n1a <br /> 1 . NAME OF STREAM, LAKE, ETC, : I <br /> 2. TYPE OF WATER RIGHTS: <br /> Fool RIPARIAN EJ APPROPRIATION <br /> i <br /> i <br /> 3. STATE PERMIT OR LICENSE NUMBER , IF APPLICABLE: <br /> ❑ D. OTHER: n1a <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.