My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ATHERTON
>
1222
>
2300 - Underground Storage Tank Program
>
PR0547926
>
INSTALL_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 11:14:16 AM
Creation date
10/10/2023 11:40:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2023
RECORD_ID
PR0547926
PE
2351
FACILITY_ID
FA0027325
FACILITY_NAME
CHEVRON #385102
STREET_NUMBER
1222
Direction
W
STREET_NAME
ATHERTON
STREET_TYPE
DR
City
MANTECA
Zip
95337
APN
22616041
CURRENT_STATUS
01
SITE_LOCATION
1222 W ATHERTON DR
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71 SO-TOOLC PROCEDURE BELOW, STEP 11 B: PREPARE DRILL AND BIT <br /> FOR 71 SO-TOOL,SEE PAGE 8 Confirm that the stop on the 3/16"drill bit supplied <br /> FOR 71 SO-TOOLCT,SEE PAGE 10 with the 71 SO-TOOLC is in the correct position before <br /> drilling. The stop is factory installed at a distance be- <br /> Note: 71 SO-TOOLC can only be used with testable tween 1-3/16"to 1-1/4"from the tip with the 71 SO- <br /> overfill valves if modified as shown below. TOOLC. If the stop is not at the correct position it must <br /> be fixed before drilling. <br /> CAUTION: If the drill stop is not in the proper loca- <br /> 1 0 1 tion failure of a pressure decay leak test may result. <br /> o � qpi <br /> k 71 SO-TOOLC <br /> I � O <br /> �I o <br /> I I <br /> li <br /> Add a 10-24 UNC thread or similar <br /> to all three legs of the 71 SO- Tip to stop dimension must <br /> TOOLC in the area shown. Use set be 1-3/16"to 1-1/4" <br /> screws to secure tool to upper Figure 118 <br /> tube. <br /> STEP 12B: DRILL HOLES <br /> 71 SO-TOOLC Modifications for Testable Inlet With the inlet tube and 71 SO-TOOLC in place,carefully <br /> drill a 3/16"diameter hole in the upper tube using the <br /> STEP 913: INSERT 71 SO-TOOLC OVER INLET TUBE hole in the 71 SO-TOOLC as a guide. The drill stop is po- <br /> To install the 71 SO-TOOLC(sold separately)over the sitioned so it will bottom out against the tool after the <br /> inlet tube,first loosen the thumb screw,so the tool can bit has drilled through the upper drop tube. If the stop <br /> pass freely over the inlet tube flange. Align the slot on is positioned wrong either no hole will be drilled,or a <br /> the tool with the key on the inlet tube and insert the through hole could potentially be drilled through the <br /> tool down. See Figure 9B. inlet tube. If no hole is drilled return to step 11 B and <br /> Tool Slot Hand tighten thumb screw check the stop dimension. If a hole is drilled through <br /> the inlet tube or into the screw hole the assembly is not <br /> tb <br /> salvageable. Drill (2) more holes in the two remaining <br /> o guide holes. <br /> Loos ___thuscre �t <br /> e �3 <br /> Key <br /> Drill through uppertubeonly <br /> STEP 10B: TIGHTEN THE 71 SO-TOOLC Figure 12B <br /> Ensure that the tool seats flat against the top of the inlet <br /> tube. To prevent vertical movement of the tool during <br /> drilling, hand tighten the thumb screw against the up- <br /> per drop tube. See Figure 10B. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.