Laserfiche WebLink
S JCOG, Inc. <br /> 555 East Weber Avenue • Stockton,CA 95202 • (209)235-0574•Email: boyd©sjcog.org <br /> San Joaquin County Multi-Species Habitat Consewation&Open Space Plan (SJMSCP) <br /> ,�• SJMSCP RESPONSE TO LOCAL JURISDICTION(RTLJ) <br /> ADVISORY AGENCY NOTICE TO SJCOG,Inc. <br /> To: Makayla Miller,San Joaquin County,Community Development Department <br /> From: Laurel Boyd, SJCOG, Inc. Phone: (209)235-0574 Email: boyd@sjcog.org <br /> Date: October 19,2023 <br /> Local Jurisdiction Project Title: PA-2300215(MS) <br /> Assessor Parcel Number(s): 063-120-19, -20 <br /> Local Jurisdiction Project Number: PA-2300215(MS) <br /> Total Acres to be converted from Open Space Use: Unknown <br /> Habitat Types to be Disturbed: Multi-Purpose Open Space Habitat Land <br /> Species Impact Findings: Findings to be determined by SJMSCP biologist. <br /> Dear Ms. Miller: <br /> SJCOG, Inc. has reviewed the application referral for PA-2300215(MS). This project consists of a Minor Subdivision application <br /> to create a Homesite Parcel from an existing Financing Parcel. Parcel 1 is 2.94 acres.Parcel 2 is 66.85 acres. Each parcel will be served <br /> by on-site septic for water waste,onsite well for water,and natural drainage. The project site is on the north side of East Eight Mile Road, <br /> 3305 feet east of North Street Route 88,Stockton(APN/Address: 063-120-19,-20/11271 E.Eight Mile Road,Stockton). <br /> San Joaquin County is a signatory to San Joaquin County Multi-Species Habitat Conservation and Open Space Plan <br /> (SJMSCP). Participation in the SJMSCP satisfies requirements of both the state and federal endangered species acts and <br /> ensures that the impacts are mitigated below a level of significance in compliance with the California Environmental Quality <br /> Act (CEQA). The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take <br /> Minimization Measure are properly implemented and monitored and that appropriate fees are paid in compliance with the <br /> SJMSCP. Although participation in the SJMSCP is voluntary, Local Jurisdiction/Lead Agencies should be aware that if <br /> project applicants choose against participating in the SJMSCP, they will be required to provide alternative mitigation in an <br /> amount and kind equal to that provided in the SJMSCP. <br /> At this time, the applicant is requesting a Minor Subdivision with no ground disturbance. Any future <br /> ground disturbing activities (e.g. roads, curb, gutter, electrical, water, etc.) or any physical structures <br /> that require ground disturbance on this or subsequent divided parcels will be subject to participate in <br /> the SJMSCP before ANY_ground disturbance occurs and should be resubmitted to this agency. Current <br /> or future owners of this-or subdivided properties should be made aware of the conditions that are placed <br /> by the SJMSCP on future development on the created parcels. <br /> This Project is subject to the SJMSCP. This can be up to a 90-day process and it is recommended that the project <br /> applicant contact SJMSCP staff as early as possible. It is also recommended that the project applicant obtain an information <br /> package. http://www.sicog.org <br /> Please contact SJMSCP staff regarding completing the following steps to satisfy SJMSCP requirements: <br /> ■ Schedule a SJMSCP Biologist to perform a pre-construction survey prior to any-ground disturbance <br /> • SJMSCP Incidental Take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and must be signed by the project applicant prior to any <br /> ground disturbance but no later than six(6)months from receipt of the ITMMs. If ITMMs are not signed within six months,the applicant <br /> must reapply for SJMSCP Coverage. Upon receipt of signed ITMMs from project applicant,SJCOG,Inc.staff will sign the ITMMs. This <br /> is the effective date of the ITMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br /> 3. Upon issuance of filly executed ITMMs and prior to any ground disturbance,the project applicant must: <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage being covered(the bond <br /> should be valid for no longer than a 6 month period);or <br />