My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2025 Reports
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Forward Landfill WMU FU-23 <br />02778 9 HDPE GEOMEMBRANE <br />7) The testing laboratory shall report the interface where deformations are observed for each test. Also submit 4"x4" tested geomembrane sample with the test results to the OWNER'S representative. The lot and roll number of the geomembrane should also be reported. <br />2.4 EXTRUDATE ROD OR BEAD <br />A. Meeting the geomembrane manufacturer requirements. <br />B. Made from same resin as the geomembrane. <br />C. Thoroughly disperse additives throughout rod or bead. <br /> D. Containing 2 to 3 percent carbon black. <br />E. Free of contamination by moisture or foreign matter. 2.5 WELDING EQUIPMENT <br />A. Supply seam welding accessories meeting the following requirements: 1. Maintain sufficient operational seaming apparatus to continue work without delay. 2. Use power source capable of providing constant voltage under combined line load. 3. Provide protective lining and splash pad large enough to catch spilled fuel under electric generator, if located on liner. 4. Tensiometers capable of measuring seam strength, calibrated and accurate within 2 pounds. 5. Dies for cutting seam samples in first class condition. 2.6 MANUFACTURER SOURCE QUALITY CONTROL <br />A. Perform the following quality control tests at the manufacturing plant or other laboratories on geomembrane products:
The URL can be used to link to this page
Your browser does not support the video tag.