My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2025 Reports
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Forward Landfill WMU FU-23 <br />02778 20 HDPE GEOMEMBRANE <br />3. Destructive tests may be required at the discretion of the QA/QC CONSULTANT. 4. Reconstruct repairs until tests indicate passing results. 3.6 GEOMEMBRANE ACCEPTANCE <br />A. The GEOSYNTHETICS CONTRACTOR retains all ownership and responsibility for the geomembrane until acceptance by the OWNER. <br />B. OWNER will accept geomembrane installation when: 1. All required documentation from the manufacturer, fabricator, and installer has been received and accepted. 2. The installation is finished. 3. Test reports verifying completion of all field seams and repairs, including associated testing, is in accord with the Section. 4. Written certification documents and drawings have been received by the QA/QC CONSULTANT and the OWNER. PART 4 MEASUREMENT AND PAYMENT (Refer to Section 01200, MEASUREMENT AND PAYMENT PROCEDURES) <br /> END SECTION
The URL can be used to link to this page
Your browser does not support the video tag.