Laserfiche WebLink
SECTION 6 <br />-tbummarY <br />'/ <br />This report presents the construption documents and supporting design criteria required for <br />completion of WMU FU-23 at the Forward Landfill. Design calculations have been performed and <br />, construction documents prepared to demonstrate that the design of this unit complies with Forward's <br />WDRs, and Title 27 requirements. <br />These Design and Construction Documents have been prepared under the supervision of Sangeeta P. <br />Lewis, whose seal as a Registered Professional Engineer in the State of California is affixed below. <br /><-//),r/a^XZl- traK*-r '! <br />SANGEETA P. LEWIS F(CEC47735 ffip-o'*d <br />d ilg. cATrcs -'n <br />EXP./2'3/' <br />k# <br />\AA4U FINAL \AA4U FU-23 DESIGN REPORT 2-18-23 6-1