My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2025 Reports
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Page 25 <br />direst shear tests between the following surfaces: <br /> <br />60-mil textured HDPE geomembrane/clay liner <br />GCL/60-mil textured HDPE geomembrane/Geocomposite Drainage Net <br />60-mil textured HDPE geomembrane/cushion geotextile <br /> <br />The QA/QC Consultant shall obtain representative samples of all required materials to perform a <br />12-inch by 12-inch direct shear tests in accordance with ASTM D5321. The direct shear tests shall <br />be performed as described in the Specifications. The results of all interface direct shear testing shall <br />be provided in the CQA Report and to the Design Engineer. The Design Engineer will use these <br />results to reject non-conforming materials or to modify the refuse fill configuration, if necessary. <br /> <br />Sampling Procedure. Samples will be taken across the entire roll width. Samples may be cut for <br />shipping purposes, but a minimum of five square feet must be sent to the testing laboratory. <br />Samplers must mark the machine direction and the manufacturer's roll identification number on the <br />sample (each piece). Samplers will also assign an acceptance test number to the sample and mark <br />the sample with that number. <br /> <br />Test Results. The QA/QC Consultant will examine all results from laboratory acceptance testing <br />and will report any nonconformance to the Construction Manager. <br /> <br />Acceptance Test Failure. If a Geomembrane acceptance sample does not comply with the <br />minimum requirements of the Specifications, the Geomembrane roll from which the sample was <br />taken will be failed by the QA/QC Consultant, and replaced by the Geomembrane Manufacturer at <br />no additional cost to the Owner. The Design Engineer shall be contacted to determine additional <br />acceptance testing requirements. <br /> <br /> <br />4.2.3 Geomembrane Installation <br /> <br />Surface Preparation. The soil surface must be prepared in accordance with the Specifications. <br />Before geomembrane installation, the subgrade will be inspected by the QA/QC Inspector and <br />Geosynthetics Contractor. The QA/QC Inspector must verify the following: <br /> <br />• All lines and grades for soil surface have been verified by the Earthwork Contractor. <br /> <br />• The soil surface has been rolled and compacted to be free of surface irregularities, loose <br />soil, and protrusions. <br /> <br />• The soil surface does not contain stones or other objects that could damage the <br />geomembrane. <br /> <br />• The anchor trench dimensions have been checked, and the trenches are free of sharp <br />objects and stones.
The URL can be used to link to this page
Your browser does not support the video tag.