Laserfiche WebLink
<br />WMU FINAL WMU FU-23 DESIGN REPORT 2-18-23 7-1 <br />SECTION 7 References <br />Brian A. Stirrat Associates (BAS) et al., Joint Technical Document, Forward Landfill, June 2003. <br />Brian A. Stirrat Associates (BAS) et al., Design Report for the Waste Management Unit (WMU) FU- <br />03 and WMU F-West, Forward Landfill, August 2003. <br />Brian A. Stirrat Associates (BAS) et al., Design Report for the Waste Management Unit FU-04, <br />Forward Landfill, April 2004. <br />Brian A. Stirrat Associates (BAS) et al., Design Report for the Waste Management Unit FU-05, <br />Forward Landfill, February 2005. <br />Bray, J.D., Rathje, E.M., et al., “Simplified Seismic Design Procedure for Geosynthetic-Lined, Solid <br />Waste Landfills,” Geosynthetics International, Vol. 5, Nos 1-2, 1998. <br />CH2M HILL, Comprehensive Landfill Description, Forward Landfill Inc., January 1992. <br />CH2M HILL, Design and Construction Documents, WMU D-93, Forward Inc. Landfill, April 1993, <br />(1993a). <br />CH2M HILL, Report of Waste Discharge, 1993 Permit Revisions, Forward, Inc. Landfill, San <br />Joaquin County, California, June 1993, (1993b). <br />CH2M HILL, Preliminary Closure and Post-Closure Maintenance Plan, Forward, Inc. Landfill, San <br />Joaquin County, California, September 1993, (1993c). <br />CH2M HILL, Construction Quality Assurance Report, WMU D-93, Forward, Inc. Landfill, January <br />1994, (1994a). <br />CH2M HILL, Buena Vista Landfill, Module 3. Design, Construction, and Operations Documents. <br />Prepared for County of Santa Cruz, March 1994, (1994b). <br />CH2M HILL, Design and Construction Documents, WMU D-94, Forward Inc. Landfill, June 1994, <br />(1994c). <br />CH2M HILL, Buena Vista Landfill, Module 3. Construction Quality Assurance Report. Prepared for <br />County of Santa Cruz, November 1994, (1994d). <br />CH2M HILL, Construction Quality Assurance Report, WMU D-94, Forward, Inc. Landfill, December <br />1994, (1994d). <br />CH2M HILL, Preliminary Closure and Post-Closure Maintenance Plan, Forward, Inc. Landfill, San <br />Joaquin County, California, Revised December 1994, (1994e). <br />CH2M HILL, Design and Construction Documents, WMU D-95, Forward Inc. Landfill, January <br />1995, (1995a). <br />CH2M HILL, Construction Quality Assurance Report, WMU D-95, Forward Inc. Landfill, October <br />1995, (1995b). <br />CH2M HILL, Clay Versus GCL Base Liner Memorandum, Figure 2B, February 24, 1997, (1997a).