Laserfiche WebLink
VENT STACK DETAILS WITH HEALY EVR PHASE II TANK (TYPICAL DOUBLE WALL) SCALE: 1" = 1'-0" culm <br /> 0 FICAL MERIDCAJUNF BLV INC <br /> 2180 MERIDIAN PARK BLVD,STE G <br /> CONCORD,CA 94520 <br /> © 1' VANIZED VENT PIPING MIN.SLOPE TO VENTS PH:(925)448-5806 <br /> 1/ PER FOOT,1OOFT.MAX LENGTH.MAX.DISTANCE <br /> CFC 2010§22D6.7.9.22 LOCATION 10 1/2' 10 1/2" WIT UT PIPE SUPPORT NOT TO EXCEED 10', <br /> VAPOR-PROCESSING EQUIPMENT SHALL BE LOCATED AT OR DIS NCES OVER 10'REQUIRE PRIOR APPROVAL OF 1"FIRE RATED, SAME ELEV.AS <br /> ABOVE GRADE.SOURCES OF IGNITION SHALL BE LOCATED NOT PRESSURE VACUUM VENT BP ESIGN MANAGER. 7 STAINLESS STEEL <br /> LESS THAN 50 FEET 15240mm FROM FUEL-TRANSFER CAPS SEE NOTE BELOW) 23 TOP OF P V VALVE <br /> ( ) PRESSURE VACUUM VENT CAP ( FLEXIBLE CONNECTOR <br /> AREAS AND NOT LESS THAN 18 INCHES(457.2mm)ABOVE 23 (SEE NOTE BELOW) DIESEL VENT CAP 2q - - - (SEE DETAIL) _ FUEL OONSILTANT. <br /> TANK FILL OPENINGS AND TOPS OF DISPENSER ISLANDS. AIR BREATHER ASSEMBLY P/N 9948 <br /> FLOAT CHECK V LVE UNISTRUT 12'MINIMUM ABOVE GRADE <br /> VAPOR-PROCESSING UNITS SHALL BE LOCATED NOT LESS P/N 9468G SUPPORT I <br /> THAN 10 FEET(3048mm)FROM THE NEAREST BUILDING OR OVERFILL PROT TION BRACKET <br /> PROPERTY LINE OF A PROPERTY WHICH CAN BE BUILT UPON. 2"GALVANIZED g g 1"BLADDER VAPOR INLET ASSM. <br /> EXCEPTION:WHERE THE REQUIRED DISTANCES TO UNION&NIPPLES 2"X1"REDUCE BUSHING SIPHON P/N 9956(REF.) <br /> BUILDINGS,PROPERTY LINES OR FUEL-TRANSFER AREAS <br /> CANNOT BE OBTAINED,MEANS SHALL BE PROVIDED TO TEE W/PLUG <br /> PROTECT EQUIPMENT AGAINST FIRE EXPOSURE.ACCEPTABLE <br /> MEANS INCLUDE: 8 2"GALVANI D ELBOW <br /> FLEX CONNECTOR DETAIL <br /> 1.APPROVED PROTECTIVE ENCLOSURES,WHICH EXTEND AT <br /> LEASE 18 INCHES(457.2mm)ABOVE THE EQUIPMENT, 2"GALVANIZED g SIPHON TUBE ADAPTER <br /> CONSTRUCTED OF FIRE-RESISTANT OR NON-COMBUSTIBLE TEE _ —_— _— P/N 9939(REF.) <br /> MATER WS OR PREMIUM <br /> 2,FIRE PROTECTION USING AN APPROVED WATER-SPRAY UNLEADED VENT HEALY CLEAN AIR SEPARATOR KIT <br /> SYSTEM DIESEL VENT REGULAR 67 INCLUDES CLEAN AIR SEPARATOR TANK, <br /> CONTRACTOR SHALL CONFIRM AND LAB UNLEADED VENT BALL VALVES,FLOAT CHECK,REDUCER <br /> VAPOR-PROCESSING EQUIPMENT SHALL DI LOCATED A ALL VENT STACKS WITH CORRE BUSHINGS AND ALL ACCESSORIES <br /> MINIMUM OF 20 FEET(fi096mm)FROM DISPENSING DEVICES. PRODUCT VENT TIE IN TO AVOI AIR SHOWN EXCEPT 1"PIPING. <br /> PROCESSING EQUIPMENT SHALL BE PROTECTED AGAINST PRODUCT CONTAMINATION AN Q BALL VALVEkquwt <br /> PHYSICAL DAMAGE BY GUARDRAILS,CURBS,PROTECTIVE IMPROPER PROCESSOR TIE-I LOCKED OPEN SIPHON TUBE <br /> ENCLOSURES OR FENCING.WHEN APPROVED PROTECTIVE PROVIDE CONFlRMATION ON PIPE AND 2 OR P/N 4186-6(REF.) <br /> ENCLOSURES ARE USED,APPROVED MEANS SHALL BE TANK CHECKLIST(LABEL MAKER OK). IN NORMAL 400 GALLON BLADDER, KTZ ATC}llY0CY5,Inc <br /> PROVIDED TO VENTILATE THE VOLUME WITHIN THE ENCLOSURE "DO NO INSTALL ON DIESEL" OPERATION 400 9943(REF.) 3090 Fite Citects04 <br /> TO PREVENT POCKETING OF FLAMMABLE VAPORS. BALL VALVE P/N 996123 P/NVAPOR Sac9OFit.Ci.l 95827 <br /> LOCK P/N 996124 HEALY CLEAN AIR SEPARATOR <br /> IF A DOWNSLOPE EXISTS TOWARD THE LOCATION OF THE o USE KEY P 996125 67 PH:(916)455-6500 FAX:(916)455-8100 <br /> VAPOR-PROCESSING UNIT FROM A FUEL-TRANSFER AREA, (36"O.D.%93°L.G.) <br /> THE CHIEF IS AUTHORIZED TO REQUIRE ADDITIONAL m BALL VALVE P/N 9961 <br /> SEPARATION BY DISTANCE AND HEIGHT. <br /> m k' LOCKED CLOSED Z <br /> CFC 2010§2206.7.9.2.3 INSTALLATION OR 3 704 P—RD <br /> VAPOR-PROCESSING UNITS SHALL BE SECURELY MOUNTED ON <br /> o <br /> CONCRETE,MASONRY OR STRUCTURAL STEEL SUPPORTS ON _- IN NORMAL O <br /> CONCRETE OR OTHER NON-COMBUSTIBLE FOUNDATIONS. OPERATION <br /> NOTE BP DOES NOT PERMIT THE VAPOR-PROCESSING BALL VALVE P/N 996123 rc <br /> EQUIPMENT TO BE INSTALLED ON ROOFS OF BUILDINGS OR - <br /> LOCK P/N 996124 <br /> CANOPY STRUCTURES.SEE ALTERNATE MOUNTING DETAILS FOR USE KEY P/N 996125 <br /> �, 2"SCH.40 GALT STEEL <br /> BP MASTER DRAKING REl£ASE NUMBER <br /> EXISTING SITES WHERE VENT RISERS AR MOUNTED AT ROOFS. <br /> 8 "NO <br /> VENT RISER PAINT TO BALL VALVE SIG SMOKING HIGH <br /> LE1 VAPORS- <br /> MATCH <br /> V-13.0 JUNE 10,2016 <br /> - MATCH SITE CONDITIONS LOCKED CLOSED <br /> I I <br /> SIGN WITH 3 HIGH LETTERING ON <br /> _ NOTE:CONTRASTING BACKGROUND DAM RENSDN OESftlPnON <br /> _ OR FRONT VIEW OF BOLLARD <br /> _ FASTEN VENT RISER TO FRAME W/ SIPHON TUBE NOT SHOWN IN THIS VIEW aryerya wWam�aww-2"STAINLESS STEEL U-BOLT,3/8°0 IN NORMAL FOR CLARITY.SEEPLAN <br /> HOLE W/LOCK WASHER HEX NUT. OPERATION P/N 4186-6(REF.) VIEW BELOWTEST EACH RISER FOR ELECTRICAL BALL VALVE P/N 996123 400 GALLON BLADDER,2"SCH.40 GALVANIZED STEEL RISER. = CONTINUITY TO VENT RACK(TYP.) LOCK P/N 996124P/N 9943(REF.) <br /> PAINT PER SPECS(TYP.) USE KEY P/N 996125 91 STRAIGHT PIPE BOLLARDS, Umm DTI^M'oma oubm <br /> 2°TEE WITH 1/4°TEST LOCATION BASED ON SITE ANN DTI—oma o*om <br /> 2"TEE WITH 1/4"TEST PORT PORT FITTING AND 1/4" CONDITIONS c cry0ry Rn RIN oma cmwm <br /> PLUG(TYP.) <br /> FITTING AND 1/4"PLUG(TYP.) BOLTED GROUND CONNECTION TO 0 1FN DTI viµom�WlEN�s <br /> VENT RACK.JUMPER#4 AWG BARE 1 2-IN-1 SENSOR BOLTED GROUND CONNECTION <br /> STRANDED CU FROM STAND ALONE BOX TO HEALY TANK BASE. eQ <br /> MOUNTING RACK <br /> ,__OEXPLOSION PROOF J-BOX E. <br /> 2,500 PSI e <br /> MOUNTED TO POST 8 EXPLOSION PROOF J-BOX VAPOR AIR MOUNTED TO POST CONCRETE TANK <br /> BOLTED GROUND CONNECTION TO SLAB.SLAB DESIGN <br /> 2-IN-1 SENSOR 1 VENT RACK.JUMPER p4 AWG BARE 19 SEAL OFF PER CALCULATIONS SEAL, <br /> BO% STRANDED CU FROM STAND ALONE Y4 AWG BARE STRANDED CU ED AR <br /> MOUNTING RACK O INSTALL(1)1"CONDUIT M G 5 C <br /> MANOMETER - 19 SEAL OFF 8 PSEE TANK ROUNDWIRE.ROUTE <br /> r H/T <br /> W/PULL ROPE FOR ( F.�AGEA/A-vin <br /> HOUSING FUTURE TANK DIAGNOSTIC BELOV♦) SYSTEM. �.Ja- yip <br /> HYDROSTATIC MONITOR SENSOR F ---- B4 AWG BARE STRANDED CU " ___ ___ ____ REQUIREMENTS ROUTE TO — — ——_ . <br /> 1 GROUND WIRE TO TANK FIELD BONIDINGING PANEL IN <br /> - 15"l,2,50 'Y <br /> FOR DOUBLE WALL VENT II GROUNDING SYSTEM u CONCRETED PSI 1 29 <br /> TRANSITION CONTAINMENT SUMP A 23CLEAR F " <br /> __= GRADE = - ___ __= GRADE - FOU DATLO TYP. N 2019 sQ <br /> P/ / / / / / ceNVENSAE 9\, i2 <br /> 2"BELLxMALE ADAPTER 4 / I\/ / / / / / #4 AWG BARE STRANDED DRAIN. TF <br /> (TYP.)"\ II --- III_- \ TANK FIELD NGROIRE To \ d_ OF�CAV�F <br /> 3^W/TEST PORT 2 \.\ \ - - / / / SYSTEM /\\/ - -- - --- --- --- --- 'I d / - .. .. <br /> OPTIONAL 6'THICK \\ L n ° � SUBBASE PER GEOTECHNICAL REPORT 4 FFS/HEALY NOTE <br /> SEPARATOR TANK INCW ES CLEAN NRNSEPARA SEPARATOR <br /> 6°WIDE DETECTABLE III III \ \�\�\�\�\/ CONCRETE SLAB /� L Im / / / / / / E TO BE LOCATED IN CONFORMANCE WffH <br /> \�\�\�\/ 4 BALL VALVES.FLOAT CHECK,REDUCER <br /> UNDERGROUND MARKING III OPTIONAL 6"THICK HYDROSTATIC MONITOR L VEE d .q MANUFACTURERS INSTALLATION MANUAL, BUSHINGS AND ALL ACCESSORIES SHOWN <br /> TAPE BURIED 6'ADE: III° CONCRETE SLAB FOR DOUBLE WALL VENT 1 I INSTALL(2)1"TO <br /> EL d a' `. CARR EXECUTIVE ORDER VR-202 OR EXCEPT 1'PIPING. <br /> BELOW FINISHED GRADE I 12"0 2500 PSI TRANSITION CONTAINMENT SUMP L Im d" MONRORING PANEL IN •� ''� � 'a' -- - <ad VR-204 AND ALL APPLICABLE STATE AND <br /> EMPIRE§31-143 CONCRETE RACK BUILDING n -� / / /SUBGRADE PER GEOTECH ICAL REPORT/ / / LOCAL CODES.PER CFC 2010 SECTIONS <br /> FOUNDATION \ /� 2206.7.9.2.2&2206.7.9.23 <br /> 2"INSIDE 3"DOUBLE L— ----- - 2"RIX CONNECTOR 2"FLEX CONNECTOR _ - - _- J a - O LIQUID SENSOR \\/\\/\\ \/\\/ <br /> WALL FRP VENT LINE 4 4 /'//' \ 7 TYP 7 NON-DISCRIMINATING z <br /> \\\\\\ \\ - IYPJ ( ) / / // NOTE.- <br /> ADDITIONAL <br /> OTE: F <br /> SLOPE TO TANK AT 1 8" \/\/\/\ /\//\/ ( BRINE FlLLED DOUBLE 1 4 4 2"INSIDE 3"DOUBLE WALL FRONT ELEVATION \/\\\ ADDITIONAL SCREEN WALL OR ARCO <br /> PER FOOT MINIMUM. /\//\//\//\ 7.\//,\ 0 LIQUID SENSOR WALL VENT LINE RP VENT UNE.SLOPE TO /\/ // CONSTRUCTION MAY BE REQUIRED BY <br /> (VACUUM MONITORED) NON-DISCRIMINATING TRANSITION SUMP TANK AT 1/8"PER FOOT \\ \\ LOCAL ORDINANCES.MINIMUM MOUNTING <br /> MINIMUM.(VACUUM MONITORED) / REQUIREMENTS ARE SHOWN IN THIS <br /> DETAIL PER CFC 2010 SECTION <br /> 4"x3'CONCENTRIC 2 TEST PORT q2^ < <br /> REDUCER(TYP.) FACTORY INSTALLED PORTS - ` - - AM/PM <br /> 2206.7.9.2.3 <br /> FOR HYDROSTATIC d' COMPACTED OR NATIVE SOIL \\ a _ a 15" m <br /> Bon0M RAND SIDE WALL j\\ (Tmlcu) /\\ \ \ \ / / r-o 11/16' (T'P') <br /> FRONT ELEVATION ��\\��\\��\\��� (TMS) <br /> 1 2-IN-1 SENSOR g <br /> OPTIONAL 6"THICK�L- BOX CONCRETE SB _ / o <br /> s ADDRESS:ELEVATION N <br /> VENT PIPING MOUNTING RACK 120 2500 PSI <br /> CONCRETE RACK / N <br /> _ FOUNDATION / e <br /> I ORDER TO PROVIDE MECHANICAL FLEXIBILITY WITHIN THE RIGID FRP PIPING SYSTEM,PROVIDE AT "i -------- ------ WEST EIGHT MILE ROAD B <br /> LEAST 4 FEET OF STRAIGHT PIPE RUN BEFORE A CHANGE IN DIRECTION OF 30 DEGREES OR MORE. I Q I Q, I Q 1 THRONTON ROAD <br /> (NFPA 30A(2012)§5.3.3(2)), (UFC(2000)?)7901.11.7.2) (IFC/CFC(2010)§3403.6.9.1) / / STOCKTON,CA 95209 E <br /> -- --- 8 EXPLOSION PROOF <br /> THE VENT CONFIGURATION SHOWN IS IN ACCORDANCE WITH CP-201 THE NUMBER OF VENT CAPS AT HYDROSTATIC MONITOR SENSOR J-BOX MOUNTED TO 30"DIA <br /> ANY GDF SHALL NOT PERMIT AN ADDITIVE LEAK RATE OF MORE THAN.17 CHF AT 2"OF WATER FOR DOUBLE WALL VENT 1 POST BASE LE9GIED M. KW <br /> COLUMN. MAX ALLOWED WITHOUT MANIFOLDING IS(3). TRANSITION CONTAINMENT SUMP ' <br /> THE VENT DISCHARGE SHALL BE LOCATED SO THAT VAPORS ARE RELEASED AT A SAFE POINT OUTSIDE �� > LIQUID SENSOR , 0[9®BC KW v <br /> OF BUILDINGS AND NOT LESS THAN 3.6 M (12 FT)ABOVE THE ADJACENT GROUND LEVEL.VAPORS 2"BEL4 OLxMALE ADAPTER II > II NON-DISCRIMINATING �.. Py <br /> SHALL BE DISCHARGED UPWARD OR HORIZONTALLY AWAY FROM ADJACENT WALLS.VENT OUTLETS SHALL (TYP.) >C 1. DLA'M1 Bt. SV o <br /> BE LOCATED SO THAT VAPORS WILL NOT BE TRAPPED BY EAVES OR OTHER OBSTRUCTIONS AND SHALL BRINE FILLED DOUBLE '� 11/16"DIA. <br /> BE AT LEAST 1.5 M (5 FT) FROM BUILDING OPENINGS.VENTS SHALL BE INSTALLED IN ACCORDANCE 3°FRP BONDED FITTING 2 L - - --- 1 WALL VENT LINE ? ,C 4 HOLES ON V-13.0 LL <br /> WITH(NFPA 30(2012)§5.7.2),(UFC(2000)§7902.13). (IFC/CFC(2010)§3404.2.7.3.3). W/TEST PORT(NP.) - - - ---- TRANSITION SUMP 'Q P 32"DIA.B.C. 03�14�2018 1E-003 <br /> VENT RISERS SHOULD STAND NO LESS THAN 3' FROM OUTSIDE EDGE OF CURB 4"0"CONCENTRIC 2DRAYANG TI <br /> REDUCER(TYP.) 2-0" 2'-0• VENT STACK INSTALLATION <br /> c <br /> y ��'' <br /> THE ACTUAL NUMBER OF VENT RISERS IS DETERMINED BY THE NUMBER UNDERGROUND INSIDE 3'DOUBLE WALL I DETAILS o - > aaaYYY a c <br /> � � � I # ,o R � B <br /> STORAGE TANKS. THE DIESEL VENT RISER(IF INSTALLED) IS ALWAYS SEPARATE. <br /> z'RATE. FRP VENT LINE SLOPE TO 4 L--- — -------1 '� FFS/HEALY CLEAN AIR SEPARATOR <br /> TANK AT 1/8'PER FOOT 4 <br /> MINIMUM.(VACUUM MONITORED) 3 g1 STRAIGHT BOLLARD(TYP.) <br /> SEE SITE PLAN FOR <br /> LAVOIR AND QUANTITY SLEET 4a ¢ <br /> REQUIRED NOTE: THIS DRAWING APPLICABLE WITH: <br /> wlz wlz wlz —HEALY VAC ASSIST STAGE II VAPOR RECOVERY PER <br /> CARB E.O. VR-202 g <br /> —VST BALANCE STAGE 11 VAPOR RECOVERY PER F6.0 m <br /> PLAN VIEW PLAN VIEW O GARB E.O. VR-204 <br />