My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
2910
>
2300 - Underground Storage Tank Program
>
PR0548756
>
INSTALL_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 9:15:55 AM
Creation date
12/20/2023 9:54:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2023
RECORD_ID
PR0548756
PE
2351
FACILITY_ID
FA0027917
FACILITY_NAME
ARCO AMPM
STREET_NUMBER
2910
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95209
CURRENT_STATUS
03
SITE_LOCATION
2910 W EIGHT MILE RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J O A Q U I N Environmental Health Department <br /> COUNTY— <br /> �c G9reorness grows her— <br /> Underground <br /> ey—Underground Storage Tank Program Service Request Inspection Report <br /> Name of Facility: ARCO AM/PM Date: 10/19/2023 <br /> Address: 2910 W EIGHT MILE RD , STOCKTON 95209 <br /> Requestor: TOWN &COUNTRY CONTRACTORS INC, TOWN &COUNTRY CONTRA Telephone: (916)636-9500 <br /> Program Element: 2303-UST/PIPING INSTALLATION Request#: SR0079377 <br /> Inspection Type: 298-UST SERVICE REQUEST- FIELD ACTIVITY <br /> Onsite Service Technician: Latham Zubillaga ICC Service Tech/Installer Exp. Date: 01/05/2024 <br /> Manufacturer training: CSI, 09/13/24 <br /> OVERALL INSPECTION NOTES AND COMMENTS <br /> NOTES <br /> On site for the installation of: <br /> 25,000-gallon Containment Solutions 87 tank <br /> 12,000-gallon Containment Solutions 91 tank(split) <br /> 10,000-gallon Containment Solutions diesel tank(split) <br /> -Verified UL labeling on all tanks. <br /> -Inspected tanks for brine leaks. No leaks were observed. <br /> -The inside of the tanks was inspected by the installer and stated to be clean and brine-free. <br /> -Verified the presence of deadmen and use of anchor straps. <br /> -Witnessed tank set. <br /> -Upon setting the 91/diesel tank,the level of brine appeared to have decreased. Approximately 10-gallons of brine was added <br /> to the 91/diesel tank.According to Containment Solutions, Inc(CSI),the loss of brine was due to air being trapped in the tank's <br /> annular space. <br /> -Verified the application of additional corrosion protection on all metal anchor components. <br /> -Verified the use of tank installation checklists. <br /> -Verified appropriate backfill. Witnessed start of backfilling, including probing of backfill under tank. <br /> -Primary tank test is scheduled to be conducted tomorrow(10/20/2023). <br /> Facility is NOT approved to receive fuel. <br /> Facility is NOT approved to operate. <br /> —Additional inspections are required. Refer to the approval letter and inspection sign-off sheet dated 9/8/2023. <br /> SR0079377 SC298 10/19/2023 <br /> EHD 23-01 Rev.07/05/2022 Page 1 of 2 Underground Storage Tank Program Service Request Inspection Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.