Laserfiche WebLink
SAN J O A Q U I N Environmental Health Department <br /> COUNTY— <br /> �c G9reorness grows her— <br /> Underground <br /> ey—Underground Storage Tank Program Service Request Inspection Report <br /> Name of Facility: ARCO AM/PM Date: 10/19/2023 <br /> Address: 2910 W EIGHT MILE RD , STOCKTON 95209 <br /> Requestor: TOWN &COUNTRY CONTRACTORS INC, TOWN &COUNTRY CONTRA Telephone: (916)636-9500 <br /> Program Element: 2303-UST/PIPING INSTALLATION Request#: SR0079377 <br /> Inspection Type: 298-UST SERVICE REQUEST- FIELD ACTIVITY <br /> Onsite Service Technician: Latham Zubillaga ICC Service Tech/Installer Exp. Date: 01/05/2024 <br /> Manufacturer training: CSI, 09/13/24 <br /> OVERALL INSPECTION NOTES AND COMMENTS <br /> NOTES <br /> On site for the installation of: <br /> 25,000-gallon Containment Solutions 87 tank <br /> 12,000-gallon Containment Solutions 91 tank(split) <br /> 10,000-gallon Containment Solutions diesel tank(split) <br /> -Verified UL labeling on all tanks. <br /> -Inspected tanks for brine leaks. No leaks were observed. <br /> -The inside of the tanks was inspected by the installer and stated to be clean and brine-free. <br /> -Verified the presence of deadmen and use of anchor straps. <br /> -Witnessed tank set. <br /> -Upon setting the 91/diesel tank,the level of brine appeared to have decreased. Approximately 10-gallons of brine was added <br /> to the 91/diesel tank.According to Containment Solutions, Inc(CSI),the loss of brine was due to air being trapped in the tank's <br /> annular space. <br /> -Verified the application of additional corrosion protection on all metal anchor components. <br /> -Verified the use of tank installation checklists. <br /> -Verified appropriate backfill. Witnessed start of backfilling, including probing of backfill under tank. <br /> -Primary tank test is scheduled to be conducted tomorrow(10/20/2023). <br /> Facility is NOT approved to receive fuel. <br /> Facility is NOT approved to operate. <br /> —Additional inspections are required. Refer to the approval letter and inspection sign-off sheet dated 9/8/2023. <br /> SR0079377 SC298 10/19/2023 <br /> EHD 23-01 Rev.07/05/2022 Page 1 of 2 Underground Storage Tank Program Service Request Inspection Report <br />