11
<br />Ll
<br />Disposal Facility Inspection Report (52)
<br />crce!nlettyr County of San Joaquin
<br />n i +, r ,' r`' ///.,✓,/� '. ,��:.._ - ial d,e, Y f - l / i rFP }pFjJ7 'i✓I !, rm,r„r.�tk. II i I i 1 1 � �{ I J11 '`--'n 5 �
<br />„-�: ,,, ,���,r� { � } t {II (, ,n%k � � z z✓I��al ..e{ t,a r mr �.n � �i i"„r. : {Ir �''� �, � � ,r i..,, ',” � ,t,� ws«. t -.,,,N �.�r
<br />39 -AA -0022 1/25/2018 LEA Periodic
<br />211111-11
<br />1i � �I�/—ter
<br />a,
<br />North County Landfill & Recycling Center County Of San Joaquin Public Works Dept
<br />r r- 4nyy.:r•gi, Y 4�.f" �;,Y° ui 's,a l�slF,�7 '.,! 6 (�,I'§ (iii i' ,' '-
<br />�l itl ��ri �i l� ,ir:': a y �I.. h,i �� Iii i �iI 5;��11riat
<br />tir ;'.� ° -���,rJ
<br />17720 East Harney Lane, Lodi
<br />95240
<br />-_
<br />g
<br />tr a;5 JY i U i`rr-.
<br />-
<br />Natalia Subbotnikova
<br />THE ABOVE FACILITY WAS INSPECTED FOR COMPLIANCE WRH APPLICABLE SECTIONS OF DIVISION W OF PUBLIC RESOURCES CODE FRC) AND TITLE 14 AND TITLE 27 CALIFORNIA CODE OF REGULATIONS(CCR)
<br />CalRecycle Solid Waste Information System (SWIS) 1 of 1
<br />-
<br />X�F
<br />x
<br />20650 - Grading of Fill Surfaces
<br />Comments: Ponding from the recent rain observed at the active face.
<br />a. Grade the area to promote lateral runoff of water and prevent future ponding.
<br />x
<br />20680 - Daily Cover
<br />Comments: The site uses soil and tarps for cover. Operator moved operation from module 5B to module 4.
<br />Uncovered solid waste was observed at the module 5B.
<br />a. Ensure that all waste is completely covered.
<br />x
<br />20750 - Site Maintenance
<br />Comments: Several depressions were observed in the green waste area.
<br />a. Repair depressions.
<br />b. Provide adequate site maintenance.
<br />x
<br />20820 - Drainage and Erosion Control
<br />Comments: Observed several erosion channels at the module 5A and 5B.
<br />a. Repair the erosion channels to prevent future waste exposure.
<br />b. Provide adequate erosion control.
<br />n. ,.,,
<br />,,.- y<,a �ni� .,u or, ,r,.w� 4 .;, .. ,,.,, :.. .. �,�;-.�-• :Z>, s, M -uaa�'rleN F,J _d-kP A)J 1.1. %- '— '4 a r.., ,, ,,, .,.;� .. £F.�.. ,i ,��(y.i ltd
<br />Notes:
<br />A. Measured perimeter soil gas well for methane concentration: SG -13= 0% (all three probes), SG -9=0% (all three
<br />probes).
<br />B. The onsite litter was minimal.
<br />C. Vegetation was at minimum at time of inspection.
<br />D. Because of the weather conditions some areas of landfill were not accessible for inspection.
<br />E. Records maintained and up to date.
<br />F. On and after January 1, 2018, a chipping and grinding operation or facility shall sample every 5,000 cubic -yards of
<br />chipped and ground material produced and determine the percentage of physical contaminants greater than 4 millimeters
<br />in the sample using a method that provides accurate results and has been approved by the LEA. If the chipping and
<br />grinding operation or facility produces less than 5,000 cubic -yards of chipped and ground material in a 12 month period,
<br />the operator shall analyze at least one composite sample of chipped and ground material produced every 12 month
<br />period (Title 14, Section 17862.1).
<br />CalRecycle Solid Waste Information System (SWIS) 1 of 1
<br />
|