My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2025 3:56:42 PM
Creation date
1/3/2024 8:29:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231021
PE
2361 - UST FACILITY
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
2908 W BENJAMIN HOLT DR STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elite IV Contractors <br /> 2535 Wigwam Di , State Lic# 100 133 1 <br /> Stockton , Ca 95202 <br /> (209 ) 461 - 633 ' <br /> ( 209 ) 461 - 6342 Fax <br /> Site : Arco 2908 W. Ren Holt Dr. Stockton, Ca . <br /> Scope of work ; RetroFit site for installation of Diesel Product on two of front Island Dispensers <br /> Phase 1 : Relocate Healy Tank and Vent Lines / Changeover 87 Tank to Diesel <br /> * Site will be down during relocation of .Healy Tank due to open Vapor lines at location . * <br /> ® Pre Test all secondary lines and vapor system for any leaks prior to construction . If any leaks <br /> are found and repairs are needed a change order will be required . Change order will be <br /> completed and billed separately. Once repairs are made we can continue with installation as <br /> quoted . <br /> ® Drain down the existing 87 fuel tank to the lowest level possible by dispensing all fuel . Once we <br /> reach a low product max, existing fuel will be pumped into the existing 87 primary tank . Tank will <br /> be triple rinsed and water will be removed and placed into hazmat drums on site . Forced air will <br /> be blown through the tank to remove any existing vapor and to help dry the tank . Manifold <br /> vapor lines will be removed from the tank and re-connected to isolate diesel tank from existing <br /> 87 & 91 fuel tanks . Installation of diesel product float will be added to Tank Probe . Existing vapor <br /> poppet will be removed and capped . Fill container will be labeled and marked as a diesel product <br /> and necessary programming of TLS will be performed for the tank to accommodate diesel as <br /> required . <br /> • The Healy tank and vapor lines will be relocated to ; desired location and vapor lines will be <br /> re- plumbed and relocated to desired location . The 87 & 91 vent lines will be manifolded and the <br /> new diesel vent line will be isolated from the gasoline grades as required by AQMD . <br /> ® The existing 87 tank then will be retrofitted and any necessary work for turbine motor and sump <br /> repairs will be made at this time to isolate the diesel tank to be ready for full operation and fuel <br /> delivery when required . <br /> • Post construction pressure decay testing and secondary testing will be performed to ensure all <br /> lines are tight . After passing results, trenches will be filled with asphalt or concrete as needed <br /> and construction will proceed to Phase 2 . <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.