Laserfiche WebLink
Elite IV Contractors <br /> 2535 Wigwam Dr. State Lic# 1001331 <br /> Stockton , Ca 95202 <br /> (209) 461 -6337 <br /> (209) 46 1 - 6342 Fax <br /> A; Dispenser Installation and Startup <br /> e Existing dispensers will be removed from island <br /> • Any wiring for turbine sumps and new UDC 's will be completed and prepared for new dispensers <br /> • New dispensers will be set and installed <br /> e New retractor kits will be installed with new hanging hardware to allow for both side fueling of <br /> vehicles . <br /> • FlexPay 6 kits will be installed at this time if applicable ( Version 23 will need to be ready for BP <br /> to complete this . If software is not available existing FlexPay IV kits will be transferred to new <br /> dispensers until software is approved for BP locations . At that time we will return and install <br /> FlexPay 6 kits and upgrade passport and commander software as needed . ) <br /> e If Version 23 software is available passport and commander will be upgraded at this time . <br /> ® TLS software will be upgraded as needed and a cold start and sensor functionality testing will be <br /> completed . <br /> ® Dispensers will be purged and a line pressure test will need to be performed by a third party <br /> tester. *Third party tester will need to be contracted and paid for by customer this is not <br /> included in this quote * <br /> • After testing is complete dispensers can be calibrated and placed into service . <br /> • Weights and Measures will be notified of new Dispenser installation <br /> e EHD will be notified of Cold Start and Sensor Functionality testing <br /> 3 <br />