My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2025 3:56:42 PM
Creation date
1/3/2024 8:29:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231021
PE
2361 - UST FACILITY
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
2908 W BENJAMIN HOLT DR STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FuR Body Entry 4 a � � p i .. <br /> Walls <br /> ell <br /> Termination entry fitting which terminates secondary <br /> pipe at the exterior of the containment sump . , <br /> - Dual integrated test ports that can be used for testing , drainage to a � <br /> sensor, or VPH constant monitoring <br /> - Quality fiberglass construction and bonded installation provides an <br /> el <br /> extremely long service life compared to flexible entry fittings <br /> - Available for single wall and double wall sumps <br /> 30 year corrosion warranty <br /> F Series Full - Body Flat Sump Wall <br /> Ile <br /> F-07S-0-F 3/4" galvanized conduit, threaded full -body with dual Injection ports flat walls 2 <br /> F-07RS-0 -1` 3/4" PVC coated conduit, threaded full-body with dual injection ports for flat walls, clamp req'd 2 <br /> F-07S-0-DF 3/4" galvanized conduit, threaded 111 full-body with dual injection ports flat walls, clamp req'd 2 <br /> F-0711S -0 -DF 3/4" PVC coated conduit, threaded full-body with duel injection ports, clamp req'd 2 <br /> F-10S -0 -1` 1 " galvanized conduit, threaded full-body with dual injection ports, clamp req'd 2 <br /> F- 0 +-0 -F 1 " PVC coated conduit, threaded full-body with dual injection ports, clamp req'd 2 <br /> F-10S -0 -DF 1 " galvanized conduit, threaded doublewall full-body fitting, dual inspection ports and tertiary boot seal, flat 2 <br /> wall, clamp req'd <br /> F1011S-0 -DF 1 " PVC conduit , threaded doublewall full-body fitting, dual inspection ports and tertiary boot seal, flat wall, 2 <br /> clamp req'd <br /> F-07-GR 3/4" brass grounding rod, full-body with brass conductor and clamps 2 <br /> F-32S T-F 3x2" FRP, threaded full-body taper by slip; dual test ports and single injection port, flat walls 2 <br /> F-43S T-F 4x3" FRP, full-body taper by slip; dual test ports and single injection port, flat walls 3 <br /> F-64S4-1` 6x4" FRP, full-body taper by slip; dual test ports and single injection port, flat walls 3 <br /> F-32A-T-F 3x2" FRP, adjustable full-body taper by slip; dual test ports and single injection port 3 <br /> 17-43A T-F 4x3" FRP, adjustable full-body taper by slip; dual test ports and single injection port, flat walls 3 <br /> T-FS -C40 On tripod compression for full body 2", 3" and 4" product fittings NA <br /> PS -400 Polysulfide adhesive 400ml (12 oz) dual cartridge with 3 stator mixing tips required man-gun NA <br /> T-MG400 Manual caulk gun for PS-400 NA <br /> em _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.