Laserfiche WebLink
Elite IV Contractors <br /> Date: 2/28/2024 <br /> Request inspection for Monday March 4th at 2:00pm <br /> Site: Arco 130 S. Wilson Way Stockton <br /> SR0087757 <br /> A) Verification of overfill prevention—Measurement of drop tubes to verify 95% <br /> tank volume shut off. <br /> B) Verification if ball floats are install do not interfere with the installed flapper <br /> valve. <br /> Thank You <br /> Carrie Miller <br /> Office Manager <br /> Phn: 209.461.6337 Fax: 209.461.6342 ( 2535 Wigwam Dr. Stockton, CA 95205 <br /> Email: carrie@eliteiv.com <br />