Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> JST klonitaring Site Plan <br /> Stite Address. San Joaquin Hospital S Engineering Plant 50 W Hospitar French Camp <br /> FLET <br /> i= <br /> .3 <br /> LNMN LTLAR <br /> L F=FILLS <br /> T==i1 MNE <br /> LJ P=PFJD E <br /> V=4_U4)R <br /> X=S[1NSP&L4SOR <br /> L=LeADmeetor <br /> B=Brine Sensor <br /> RED DIESEL I=Smart Sensor <br /> . _ . . . . S=STP <br /> P C=Flarsb&Cksiata <br /> . . . . . . . . . . E=E Smp <br /> F <br /> Gen 1 <br /> TAN[ <br /> Gen 2 <br /> Tr4NK <br /> Line Continues 10 EQ!:ers. GPW Tank Gauge <br /> FPIFLNG e <br /> . ��iRRD1S�S] <br /> . DMIm E Of piping <br /> . elat eY elland <br /> QFFICE LDC s.',,a <br /> . undaTground <br /> jrdli=g t9 <br /> x T;n�l eat Pcat ac=ate.lve <br /> cannot speculate <br /> . . . . . . . . . . . . . . . DAY � bine pmL. <br /> TANK <br /> i <br /> A?W iton.:rmdsrground7hmtara nor-c&ble to the cevg6--mgt5ek scmm ore a <br /> preasaionmrapimoin mb�mdare L7,mt'mg <br /> Mat fa scala <br /> Date map was-swr.: Y=l <br /> Ins&uD&ns <br /> IF you already have a diagram that shows of required information.you rray indude it rather Than this page,with your Moniloring Systern Certification. On your site plan, <br /> show the general layout of tank=_and piping. Meariy identify locations of the following equipment,if installed:monitoroW system control Panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers.or other secGatdary containment areas;mechanical of elaclronic line leak detei4om;and in-tank liquid revel <br /> probes(if used for leakdelecdon). In the space provided,note the date this Site Plan was prepared. <br /> Page 6 of 6 <br />