My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
2771
>
2300 - Underground Storage Tank Program
>
PR0234251
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2024 3:19:30 PM
Creation date
1/3/2024 9:25:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0234251
PE
2361 - UST FACILITY
FACILITY_ID
FA0003508
FACILITY_NAME
TULARE FARMS LLLP
STREET_NUMBER
2771
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
17710025
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
2771 E FRENCH CAMP RD MANTECA 95336
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S A N J 0 A Q I I I Irl Environmental Health Department <br /> CCUNTY <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> TULARE FARMS LLLP 2771 E FRENCH CAMP RD, MANTECA January 19, 2024 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 203 CCR 2712(b)(1-2)Failure to maintain monitoring records for 36 months and maintenance records for 60 months. <br /> OBSERVATION: Maintenance and monitoring records for the last three years were not found on site. <br /> -Secondary Containment Test Result 12/15/2023 <br /> -Monitoring System Certification Result 1/19/2023 <br /> REGULATION GUIDANCE: These records shall be maintained on site for at least three years. Monitoring records <br /> include: (1)date and time of all monitoring or sampling; (2)monitoring equipment calibration and maintenance <br /> records; (3)results of any visual observations; (4)results of sample analysis performed a lab or in the field; (5)logs <br /> of all readings of gauges or other monitoring equipment, ground water elevations, or other test results; (6)results of <br /> inventory readings and reconciliations. <br /> CORRECTIVE ACTION: Immediately locate and maintain all missing maintenance and monitoring records for the <br /> last three years on site. Submit copies of any missing work orders and alarm records to the EHD. <br /> This is a repeat violation, Class ll. <br /> 208 CCR 2716(a-e) Failure to comply with the designated operator inspection requirements. <br /> OBSERVATION: Designated operator reports were not signed within the required time frame. <br /> -The 6/15/2023 designated operator report was signed by the owner/operator on 6/29/2023. <br /> -4/19/2023 DO report was not signed. <br /> -3/22/2023 DO report was not signed. <br /> REGULATORY GUIDANCE:Within 48 hours of the completion of the designated UST operator visual inspection, <br /> the designated operator shall sign and provide the owner or operator with a copy of the inspection report. Within 72 <br /> hours of being provided a signed copy of the report,the owner or operator shall provide a description of each <br /> corrective action taken or to be taken and shall sign and date the report, acknowledging the identified compliance <br /> issues. <br /> CORRECTIVE ACTION: Ensure all designated operator inspection reports are completed and signed within the <br /> required time frame in the future. <br /> This is a repeat violation, Class II. <br /> Overall Inspection Comments: <br /> An inspection checklist was provided to the facility operator on the day of inspection. A complete report was <br /> finished on 1/24/2024 and replaces the initial checklist. <br /> Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br /> documenting the corrective actions that have been or will be taken for each violation, and any supporting <br /> paperwork, within 30 days of receiving the complete inspection report. <br /> FA0003508 PR0234251 SCO01 01/19/2024 <br /> EHD 23-01 Rev.12/06/2021 Page 5 of 6 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.