Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) 87 91 Diesel E-85 <br /> Are both vent and tank riser piping 0 Yes © Yes © Yes © Yes <br /> secondarily contained? © No ✓© No ® No 0✓ No <br /> OPE Model 61 SO 61 SO 71 SO 71 SO <br /> What is the OPE response when Shut off Shut off © Shut off 57 Shut off <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) © Restricts EI Restricts © Restricts 0 Restricts <br /> Flow Flow Flow Flow <br /> © Audible © Audible FM Audible 0 Audible <br /> Alarm Alarm Alarm Alarm <br /> El Visual © Visual [M Visual Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping © Yes* Yes* Yes* Yes* <br /> that may interfere with the OPE operation? ® No ® No ® No No <br /> At what level in the tank is the OPE set to 99.625 99.875 97 101.25 <br /> activate? Inches from bottom of tank <br /> What is the percent capacity of the tank at 92.6 93 92.8 94 <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to ✓] Yes ✓0 Yes* © Yes* © Yes* <br /> respond when the stored substance © No [M No © No 0 No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results F] Pass ❑fT Pass 0 Pass ® Pass <br /> Q Fail © Fail 0 Fail E Fail <br /> 8. COMMENTS <br /> Describe all answers marked "No"or "Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> Diesel Droptube was replaced with inspector onsite. Existing <br /> droptube was found to be severly bent, and was getting stuck in <br /> riser. <br /> * Mark here if: <br /> ® Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />