My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2024 5:00:35 PM
Creation date
1/10/2024 8:22:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer 0 Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure 0 Vacuum ❑ Hydrostatic <br /> Test Equipment Used:4"VACUUM GAUGE <br /> Tank ID UE0200001 <br /> Tank Manufacturer Modern Welding <br /> Tank Capacity 8,000 gal <br /> Test Start Time 9:00 AM <br /> Initial Reading -10.00 <br /> Test End Time 10:00 AM <br /> Final Reading -10.00 <br /> Change in Reading 0.00 <br /> Pass/Fail Criteria 0.00 <br /> Tightness Test Results p Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ❑✓ Industry Standard ❑ Professional Engineer <br /> Test Type ❑✓ Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: 4"PRESSURE GAUGE <br /> Pipe Run ID VENT <br /> Pipe Manufacturer A.O SMITH <br /> Test Start Time 9:00 AM <br /> Initial Reading 5.00 <br /> Test End Time 10:00 AM <br /> Final Reading 5.00 <br /> Change in Reading 0.00 <br /> Pass/Fail Criteria 0.00 <br /> Tightness Test Results ❑✓ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.