My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
755
>
2300 - Underground Storage Tank Program
>
PR0508090
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 8:35:18 AM
Creation date
1/10/2024 2:45:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0508090
PE
2361 - UST FACILITY
FACILITY_ID
FA0007938
FACILITY_NAME
CHEVRON #208117**
STREET_NUMBER
755
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
24202029
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
755 S TRACY BLVD TRACY 95376
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron Monitoring Certification Checklist <br />Store Number: 208117 Address: 755 S. TRACY BLVD TRACY, CA 95376 <br />Date: 2/7/2024 Company: TANKNOLOGY INC.Technician: Jesus Saldivar <br />T1T2InstructionStep <br />Product REGULAR PREMIUM <br />FiberglassFiberglass <br />Annular Riser Height (measured)77.00 in.78.50 in.1 <br />117.75 in.2 117.75 in. <br />3 184.87 in.184.87 in. <br />263.37 in.261.87 in.4 <br />Yes Yes5 <br />Is tank annular sensor in the correct position? <br />Yes Yes <br />6 YesYes <br />Yes Yes8 <br />Yes Yes9 <br />7 <br />Replaced in Last 30 Days <br />Yes <br />YesHas Veeder Root Programming before & after been attached to the Work Order? <br />Yes <br />Additional Comments: <br />Note 1: Certain Veeder Root Software versions will automatically revert to the default tank manifold settings any time the programming is changed, such as when sensors are <br />temporarily X'ed out, etc. <br />Has the Veeder Root Battery been replaced & dated prior to failsafe? <br />{If battery backup failed, label and leave failed battery on top of console, note in comments and advise your OM) <br />Has Veeder Root Programming before & after testing been printed & verified? <br />(especially tank manifolding setup - see Note 2) <br />Have all sensor model numbers been verified against the Veeder Root cord label? <br />Make a note if sensor label missing or illegible, & approx, cord length for -208/-209 with missing labels <br />Tank Diameter: (from tank chart, <br />for example: 118.375", 117.75", 111 ",92 ",etc.) <br />Mark & label the required sensor length on <br />sensor cord. Label should be under the cap & <br />serve to prevent the cord being pulled too short. <br />FRPTanks: with the marked required length <br />lining up with the top of the annular riser? <br />Steel Tanks: sensor touching bottom with slack <br />above the marked required sensor length? <br />Are the DW pipe boots pulled back in tank sumps? <br />(Y/N or N/A, note if can‘t be verified because <br />clamshell pointing down) <br />Are tank sump sensors back in their holders and <br />in the correct position? <br />(Y/N or N/A document with photo) <br />For FRP tanks, 1/2 circumference of the tank <br />(0.5 X 3.14 X tank diom.) OR fa.57 x step 2) <br />Approximate gallons of product dispensed for <br />purging, etc. and returned to tank <br />Required annular sensor length: <br />FRP = Riser +1/2 Circumference = step 11 step 3 <br />Steel = Riser + diameter = step 1 + step 2 <br />Tank Type <br />(DWFRP, DWSteel, SWFRP)
The URL can be used to link to this page
Your browser does not support the video tag.