My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1756
>
2300 - Underground Storage Tank Program
>
PR0231300
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2024 1:02:26 PM
Creation date
1/10/2024 3:01:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231300
PE
2361
FACILITY_ID
FA0001858
FACILITY_NAME
MY MINI MART
STREET_NUMBER
1756
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11721005
CURRENT_STATUS
01
SITE_LOCATION
1756 N WILSON WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ® Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: Caldwell Level Change Indicator <br /> Sump/UDC ID 1-87-PS 2-91-PS <br /> Sump Manufacturer Western FG Western FG <br /> Sump Depth (inches) 45" 44" <br /> Sump Bottom to Top of 22" 22" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 8:52 8:57 <br /> Initial Reading .001 .001 <br /> Test End Time 9:22 9:27 <br /> Final Reading .001 .001 <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria > .002 > .002 <br /> Tightness Test Results M Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID UDC 1&2 UDC 3&4 <br /> Sump Manufacturer Bravo Bravo <br /> Sump Depth (inches) 10" 10" <br /> Sump Bottom to Top of BP BP <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 9:02 9:07 <br /> Initial Reading .001 .001 <br /> Test End Time 9:32 9:37 <br /> Final Reading .001 .001 <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria > .002 > .002 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.