Laserfiche WebLink
SP-5 <br />SWT Engineering <br />(\\WIN-8TQG9DPOKTK\Public2\Shares\Public\PROJECTS\SiteLogIQ\Site Characterization Work Plan\Appendices\Appendix B - Sampling and <br />Analysis Plan\Appendix B - Sampling and Analysis Plan.docx) <br />Date and time of sample collection <br />Designation of sample as composite or grab <br />Type of sample (soil, sediment or water) <br />Type of sampling equipment used <br />Field instrument reading, if applicable <br />Field observations and details related to analysis or integrity of samples <br />(e.g., weather conditions, noticeable odors, colors, etc.) <br />Preliminary sample descriptions <br />Sample preservation <br />Sample identification numbers and explanatory code <br />Name of recipient laboratory <br />In addition to the sampling information, deviations from the sampling plan and the level of health <br />and safety protection required to perform sampling will also be recorded in the logbook. <br />2.2 Photographs <br />Photographs will be taken at the sampling locations. The photos will verify information entered <br />in the field logbook. Each photo taken will have a caption in the logbook with the approximate <br />time, date, and location. <br />2.3 Reporting <br />Once the excavation activities, waste sampling are completed and the analytical results are <br />received and evaluated, SWT will prepare a completion report for submittal to the San Joaquin <br />LEA and RWQCB within 30 days after receipt of the final analytical results.