Laserfiche WebLink
t50-T00L PROCEDURE BUrOW <br />DR 71S0&'IiOC44 SEEPAGE 9 <br />OR 715040OL,CT, SU PAGE 10 <br />Note: 71 s¢T00L can only bo used with tostabl <br />overfill valves If modified as shown below. A 2' <br />wide slot must be added to accommodate cast 1 <br />ter--' Rdd 7 wide <br />- .� '� slat to use with <br />ii "'" testablevahres <br />KN <br />KN I <br />A .> <br />4.1 <br />Modificadans for Tastable inlet <br />STEP 9J1: INSERT 775aT00L OYER INLET'fil RE <br />To install the 7150=TOOL (sold separately) over the in lel <br />tube,. first loosen al I three knobs, so the tool can pass <br />,eely over the inlet tube flanges Align the slot on the <br />tool with the key on the Inlet tube and insel7 Mt tool <br />dam. U%FIgum9A. <br />FiyYYe PA <br />STEP 10At TIGHMN THE 7150 -TOOL <br />Use the three view holes to ensure that the tool seats <br />out flat against the top of the iniet tube. To prevent <br />vertical movement of the tool during drilling, hared <br />tighten all three kraus wrenty to the upper drop tube <br />Set FIOWG NIO& <br />STEP 11 A: PREPARE DR(L L ANO dfT <br />carMrm that the stop on the 3/16'drill bit supplied <br />with the 71SOmTOOL is in the correct position before <br />drilling. The soup is factory installed at a distance +x- <br />tween 2410 2-1116" from the tip with the 71 SOLTOOL <br />the stop is not at the correct position it must be steed <br />before drilling. <br />CAUTIONS K the drill stop k not in Ura proper lau- <br />Non failure of a pratsure denary lank tat may result. <br />Tip to stop df mension must l>e <br />2" to 2-1/16'. <br />11A <br />rrgun <br />rumSTEP 12A: DRILL NOLIL+ <br />tighten with the inlet tube and 7150.700E in place, carefully <br />knobs drill a 3/16' dlameter hole In the upper tube using the <br />drill bushing in the knob as a guide. The drill step is pa <br />I sitioned so it will bottom ot,t agalnst the knob after the <br />bit rias drilled through th@ upper drop tube. If the stop <br />is pusitloned wrong eAhei res hole will be drilW, or a <br />t1,r Pugh hole cauId potent Wy led be drilthrough the <br />Iniet tube. if no hole is drilled return to step I IAand <br />J check the stop dimension, if a hole is drilled through <br />'I the inlet tube or imu the screw hole the assembly is not <br />11 salvageable, Drill (2) more holes in the two remaining <br />Knobs, <br />Flgwe con <br />D.111 thru upper <br />eu6e arty <br />Figure 1Lt <br />