My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1234
>
2300 - Underground Storage Tank Program
>
PR0516248
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 8:35:50 AM
Creation date
1/10/2024 4:11:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0516248
PE
2361 - UST FACILITY
FACILITY_ID
FA0012532
FACILITY_NAME
CHEVRON STATION #209167
STREET_NUMBER
1234
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22120016
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1234 E YOSEMITE AVE MANTECA 95336
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP i3: DIMPLE FIRST HOLE <br />Remove toot. Remove any chips or burrs from rhe drill- <br />ing operation. Place the assembly on a solid surface. <br />using the punch supplied with the MSD 1001, 715b - <br />Tom. and 7150-701) T, align the tip of the punch <br />with the drilled bare and dimple rite upper drop tube by <br />striking the punch with a hammer until the drop tube is <br />formed into countersunk (tole in the inlet tube. After <br />purxhing, remove any chVs that may have fallen into <br />the inlet Whe screw hole, <br />Figvrr 13 <br />STEP 14: ASSEMBLE AR5T SCREW <br />Ensure that the drop tube was formed into thPCW <br />mer <br />sunk screw hole as shown In Figure 14 if not return to <br />Step 13. Apply black moiy grease to Screw and tighten <br />first screw Into Inlet tutu with a screwdriver, use only <br />the taptite screws that are supplied with the unit Seat- <br />iN torque is ao illAM min. to 3S ir>`Ibs rna>c Screw head <br />should be Rush wlththedroptube, Vonatovertlght- <br />en. <br />Vwwdwdno�lebfo�,Y tae <br />0M`f.+l�ew <br />ilyvr'd f�f <br />51 is: Dilmibu REMAINING HOLES <br />Remove any chips of burrs (tarn the drillingoperation, <br />D mple the next (2) holes as dyne in Step 13, Make vire <br />the assembiy is on a solid surface when punchirtg.. After <br />punchinm remove any chips that may have fallen into <br />the mitt tube Snow hole. <br />Align punch with <br />drilled hole <br />Figure t5 <br />51 EP 16: ASSEMw E OTHER SCIlM <br />Apply black molt' grease to screws and tighten the ath- <br />er (2) screws into inlet tube with a screwdriver as done <br />in Step 14. Use only the septile screws that are supplied <br />with ttm unit. Stating torque is 20 in-Itx min. to 35 in,, <br />lbs max. Do not over tighten. <br />S1EP 17: AppLY t:HEASE7t) LO1N�t t)-pIiIG AND <br />EDDY THREADS <br />Apply black cooly grease to the lower tube erring and <br />6ady threads as shown. Make sure coverage is carry <br />pletely around the o -ring. Install o•rirxj in groove just <br />al uve threads. <br />Applygreese <br />arourdc*ring " <br />Offing" �� <br />9'°o're &adytl;r�+sCs <br />Ffgnrr 17 <br />I1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.