Laserfiche WebLink
Vapor Recovery FIJI Riser <br />RI64r III <br />OPW <br />Ball Float <br />Tube tut <br />per Local <br />ta" Minimum <br />Cl@arancefor <br />Float <br />.�— Align Float Along Length of Ts nk <br />FipuneZa <br />orient socket <br />actor be- <br />n jack <br />ew bolts <br />�rel�A <br />4" NPT <br />Hippie <br />Swivel <br />Product <br />Adaptor <br />Screw <br />Kit <br />FOR TESTABLENiObEl.Sl]NLYx CheCkinstsllatian <br />again as done in Step 23 to ensure poppet actuates and <br />resets properly, see page 17 for full testing derails Ap- <br />ply pipe dope to the socket adaptor threads. Pipe dope <br />should be a no"ardening gasoline resistant pipe <br />thread seal compound, Install socket adaptor and <br />torque to 35 ft-Ibs (42 In -lbs) minimum to S.0 ft-Ibs (60 <br />In It)s) maximum. Afwinsulling socket adaptor where <br />required, pressure test testable overfill valve per GARB <br />TP201,1 D to ensure valve is vapor tight <br />